LNG Atlas

Gas transmission pipeline · Opolskie Voivodeship to Opolskie Voivodeship

Lewin Brzeski-Nysa Pipeline

Lewin Brzeski-Nysa Pipeline is a proposed gas transmission pipeline in Poland. The tracker lists 1 tracked segment, 38 km long, starting up in 2020. It runs from Opolskie Voivodeship to Opolskie Voivodeship. It is owned by Gaz-System.

Length

38 km

Capacity

Not reported

Segments tracked

1

Largest diameter 12700 mm (500 in)

Route

Lewin Brzeski-Nysa Pipeline runs from Opolskie Voivodeship to Opolskie Voivodeship. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Opolskie Voivodeship
To
Opolskie Voivodeship
Start country
Poland
End country
Poland
Countries crossed
Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
50 km
GEM pipeline ID
P3941
Start year
2020
Estimated cost (GEM, US dollars)
$83.6 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedOpolskie Voivodeship → Opolskie Voivodeship38Not reported12700 mm2020GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Lewin Brzeski-Nysa Pipeline run?
Lewin Brzeski-Nysa Pipeline runs from Opolskie Voivodeship to Opolskie Voivodeship, crossing Poland.
How long is Lewin Brzeski-Nysa Pipeline?
Lewin Brzeski-Nysa Pipeline is 38 km long.
How much gas can Lewin Brzeski-Nysa Pipeline carry?
No design capacity is reported for Lewin Brzeski-Nysa Pipeline. That is an absent figure, not a zero.
Is Lewin Brzeski-Nysa Pipeline operating?
Lewin Brzeski-Nysa Pipeline is proposed, with a reported start year of 2020.
Who owns Lewin Brzeski-Nysa Pipeline?
Lewin Brzeski-Nysa Pipeline is owned by Gaz-System, as recorded in the current tracker release.

More gas pipelines in Poland

Listed in name order among the 48 pipelines tracked in Poland, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail