Gas transmission pipeline · Bushehr to Markazi
IGAT 3 Gas Pipeline
IGAT 3 Gas Pipeline is an operating gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 1,195 km long and 32.85 bcm/y of capacity. It runs from Bushehr to Markazi. It is owned by Iran Ministry of Petroleum.
Length
1,195 km
Capacity
32.9 bcm/y
24.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
IGAT 3 Gas Pipeline runs from Bushehr to Markazi. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bushehr
- To
- Markazi
- Start country
- Iran
- End country
- Iran
- Countries crossed
- Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,144 km
- GEM pipeline ID
- P0443
- Start year
- Not reported
- Estimated cost (GEM, US dollars)
- $2.5 billion
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Bushehr → Markazi | 1,195 | 32.9 | 1422 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Iran NIOC LNG Terminal | Iran | Export | Under construction | 1.7 km | route proximity |
| Kangan LNG Terminal | Iran | Export | Cancelled | 1.7 km | route proximity |
| Persian NIOC LNG Terminal | Iran | Export | Cancelled | 1.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name IGAT 3 Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does IGAT 3 Gas Pipeline run?
- IGAT 3 Gas Pipeline runs from Bushehr to Markazi, crossing Iran.
- How long is IGAT 3 Gas Pipeline?
- IGAT 3 Gas Pipeline is 1,195 km long.
- How much gas can IGAT 3 Gas Pipeline carry?
- IGAT 3 Gas Pipeline has a design capacity of 32.9 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is IGAT 3 Gas Pipeline operating?
- IGAT 3 Gas Pipeline is operating.
- Who owns IGAT 3 Gas Pipeline?
- IGAT 3 Gas Pipeline is owned by Iran Ministry of Petroleum, as recorded in the current tracker release.
- Does IGAT 3 Gas Pipeline serve an LNG terminal?
- IGAT 3 Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Iran
Listed in name order among the 36 pipelines tracked in Iran, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.