Gas transmission pipeline · Bushehr to Sistan-Baluchistan

IGAT 7 Gas Pipeline

IGAT 7 Gas Pipeline is an operating gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 907 km long and 18.4 bcm/y of capacity, starting up in 2010. It runs from Bushehr to Sistan-Baluchistan. It is owned by Iran Ministry of Petroleum.

Length

907 km

Capacity

18.4 bcm/y

13.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

IGAT 7 Gas Pipeline runs from Bushehr to Sistan-Baluchistan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bushehr
To
Sistan-Baluchistan
Start country
Iran
End country
Iran
Countries crossed
Iran
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,790 km
GEM pipeline ID
P0446
Start year
2010
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingBushehr → Sistan-Baluchistan90718.41422 mm2010GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Iran NIOC LNG TerminalIranExportUnder construction0.3 kmroute proximity
Kangan LNG TerminalIranExportCancelled0.3 kmroute proximity
Persian NIOC LNG TerminalIranExportCancelled0.3 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does IGAT 7 Gas Pipeline run?
IGAT 7 Gas Pipeline runs from Bushehr to Sistan-Baluchistan, crossing Iran.
How long is IGAT 7 Gas Pipeline?
IGAT 7 Gas Pipeline is 907 km long.
How much gas can IGAT 7 Gas Pipeline carry?
IGAT 7 Gas Pipeline has a design capacity of 18.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is IGAT 7 Gas Pipeline operating?
IGAT 7 Gas Pipeline is operating, having started in 2010.
Who owns IGAT 7 Gas Pipeline?
IGAT 7 Gas Pipeline is owned by Iran Ministry of Petroleum, as recorded in the current tracker release.
Does IGAT 7 Gas Pipeline serve an LNG terminal?
IGAT 7 Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Iran

Listed in name order among the 36 pipelines tracked in Iran, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail