Gas transmission pipeline · Bushehr to Azerbaijan
IGAT 11 Gas Pipeline
IGAT 11 Gas Pipeline is an under construction gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 1,200 km long and 40.15 bcm/y of capacity, starting up in 2026. It runs from Bushehr to Azerbaijan. It is owned by Iran Ministry of Petroleum.
Length
1,200 km
Capacity
40.1 bcm/y
29.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
IGAT 11 Gas Pipeline runs from Bushehr to Azerbaijan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bushehr
- To
- Azerbaijan
- Start country
- Iran
- End country
- Iran
- Countries crossed
- Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,623 km
- GEM pipeline ID
- P0441
- Start year
- 2026
- Estimated cost (GEM, US dollars)
- $4 billion
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Bushehr → Azerbaijan | 1,200 | 40.1 | 1422 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Iran NIOC LNG Terminal | Iran | Export | Under construction | 1.6 km | route proximity |
| Kangan LNG Terminal | Iran | Export | Cancelled | 1.6 km | route proximity |
| Persian NIOC LNG Terminal | Iran | Export | Cancelled | 1.6 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name IGAT 11 Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does IGAT 11 Gas Pipeline run?
- IGAT 11 Gas Pipeline runs from Bushehr to Azerbaijan, crossing Iran.
- How long is IGAT 11 Gas Pipeline?
- IGAT 11 Gas Pipeline is 1,200 km long.
- How much gas can IGAT 11 Gas Pipeline carry?
- IGAT 11 Gas Pipeline has a design capacity of 40.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is IGAT 11 Gas Pipeline operating?
- IGAT 11 Gas Pipeline is under construction, with a reported start year of 2026.
- Who owns IGAT 11 Gas Pipeline?
- IGAT 11 Gas Pipeline is owned by Iran Ministry of Petroleum, as recorded in the current tracker release.
- Does IGAT 11 Gas Pipeline serve an LNG terminal?
- IGAT 11 Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Iran
Listed in name order among the 36 pipelines tracked in Iran, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page