Gas transmission pipeline · Asaluyeh to Yazd
IGAT 11 Gas Pipeline
IGAT 11 Gas Pipeline is a shelved gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 1,621 km long and 40.15 bcm/y of capacity, starting up in 2026. It runs from Asaluyeh to Yazd. It is owned by National Iranian Gas Company.
Length
1,621 km
Capacity
40.1 bcm/y
29.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
IGAT 11 Gas Pipeline runs from Asaluyeh to Yazd. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Asaluyeh
- To
- Yazd
- Start country
- Iran
- End country
- Iran
- Countries crossed
- Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 651 km
- GEM pipeline ID
- P0441
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Asaluyeh → Yazd | 1,621 | 40.1 | 1422 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does IGAT 11 Gas Pipeline run?
- IGAT 11 Gas Pipeline runs from Asaluyeh to Yazd, crossing Iran.
- How long is IGAT 11 Gas Pipeline?
- IGAT 11 Gas Pipeline is 1,621 km long.
- How much gas can IGAT 11 Gas Pipeline carry?
- IGAT 11 Gas Pipeline has a design capacity of 40.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is IGAT 11 Gas Pipeline operating?
- IGAT 11 Gas Pipeline is shelved, with a reported start year of 2026.
- Who owns IGAT 11 Gas Pipeline?
- IGAT 11 Gas Pipeline is owned by National Iranian Gas Company, as recorded in the current tracker release.