Gas transmission pipeline · Bushehr to Azerbaijan

IGAT 11 Gas Pipeline

IGAT 11 Gas Pipeline is an under construction gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 1,200 km long and 40.15 bcm/y of capacity, starting up in 2026. It runs from Bushehr to Azerbaijan. It is owned by Iran Ministry of Petroleum.

Length

1,200 km

Capacity

40.1 bcm/y

29.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1422 mm (56 in)

Route

IGAT 11 Gas Pipeline runs from Bushehr to Azerbaijan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bushehr
To
Azerbaijan
Start country
Iran
End country
Iran
Countries crossed
Iran
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
1,623 km
GEM pipeline ID
P0441
Start year
2026
Estimated cost (GEM, US dollars)
$4 billion
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionBushehr → Azerbaijan1,20040.11422 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Iran NIOC LNG TerminalIranExportUnder construction1.6 kmroute proximity
Kangan LNG TerminalIranExportCancelled1.6 kmroute proximity
Persian NIOC LNG TerminalIranExportCancelled1.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does IGAT 11 Gas Pipeline run?
IGAT 11 Gas Pipeline runs from Bushehr to Azerbaijan, crossing Iran.
How long is IGAT 11 Gas Pipeline?
IGAT 11 Gas Pipeline is 1,200 km long.
How much gas can IGAT 11 Gas Pipeline carry?
IGAT 11 Gas Pipeline has a design capacity of 40.1 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is IGAT 11 Gas Pipeline operating?
IGAT 11 Gas Pipeline is under construction, with a reported start year of 2026.
Who owns IGAT 11 Gas Pipeline?
IGAT 11 Gas Pipeline is owned by Iran Ministry of Petroleum, as recorded in the current tracker release.
Does IGAT 11 Gas Pipeline serve an LNG terminal?
IGAT 11 Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Iran

Listed in name order among the 36 pipelines tracked in Iran, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail