Gas transmission pipeline · Khuzestan to Gilan
IGAT 1 Gas Pipeline
IGAT 1 Gas Pipeline is an operating gas transmission pipeline in Iran. The tracker lists 1 tracked segment, 1,104 km long, starting up in 1970. It runs from Khuzestan to Gilan. It is owned by National Iranian Oil Co.
Length
1,104 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
IGAT 1 Gas Pipeline runs from Khuzestan to Gilan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Khuzestan
- To
- Gilan
- Start country
- Iran
- End country
- Iran
- Countries crossed
- Iran
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,383 km
- GEM pipeline ID
- P3957
- Start year
- 1970
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Khuzestan → Gilan | 1,104 | Not reported | 1067 mm | 1970 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name IGAT 1 Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does IGAT 1 Gas Pipeline run?
- IGAT 1 Gas Pipeline runs from Khuzestan to Gilan, crossing Iran.
- How long is IGAT 1 Gas Pipeline?
- IGAT 1 Gas Pipeline is 1,104 km long.
- How much gas can IGAT 1 Gas Pipeline carry?
- No design capacity is reported for IGAT 1 Gas Pipeline. That is an absent figure, not a zero.
- Is IGAT 1 Gas Pipeline operating?
- IGAT 1 Gas Pipeline is operating, having started in 1970.
- Who owns IGAT 1 Gas Pipeline?
- IGAT 1 Gas Pipeline is owned by National Iranian Oil Co, as recorded in the current tracker release.
More gas pipelines in Iran
Listed in name order among the 36 pipelines tracked in Iran, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- IGAT 10 Gas Pipeline632 km
- IGAT 11 Gas PipelineBushehr to Azerbaijan · 1,200 km
- IGAT 2 Gas PipelineFars to Qazvin · 680 km
- Esfarayen Gas PipelineRoute and length not reported
- Esfarayen–Neqab–Joghatai Gas PipelineRazavi Khorasan to Razavi Khorasan · 48 km
- Esfarayen–Neqab–Joghatai Gas PipelineRazavi Khorasan to Razavi Khorasan · 35 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.