Gillis Access Project

Gillis Access Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 63 km long and 14.31 bcm/y of capacity, starting up in 2027. It runs from Louisiana to Louisiana. It is owned by TC Energy Corp.

Length

63 km

Capacity

14.3 bcm/y

10.5 Mtpa LNG equivalent

Segments tracked

1

Route

No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.

From
Louisiana
To
Louisiana
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
Not reported
GEM pipeline ID
P7807
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
ExtensionProposedLouisiana → Louisiana6314.3—2027No route

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Gillis Access Project run?
Gillis Access Project runs from Louisiana to Louisiana, crossing United States.
How long is Gillis Access Project?
Gillis Access Project is 63 km long.
How much gas can Gillis Access Project carry?
Gillis Access Project has a design capacity of 14.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Gillis Access Project operating?
Gillis Access Project is proposed, with a reported start year of 2027.
Who owns Gillis Access Project?
Gillis Access Project is owned by TC Energy Corp, as recorded in the current tracker release.
Does Gillis Access Project serve an LNG terminal?
Gillis Access Project passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United States

Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.