Gas transmission pipeline · Harrison County to Panola County
Gemini Carthage Pipeline
Gemini Carthage Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 22 km long and 12.4 bcm/y of capacity, starting up in 2019. It runs from Harrison County to Panola County. It is owned by Gemini Carthage Pipeline LLC.
Length
22 km
Capacity
12.4 bcm/y
9.1 Mtpa LNG equivalent
Segments tracked
1
Route
Gemini Carthage Pipeline runs from Harrison County to Panola County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Harrison County
- To
- Panola County
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 22 km
- GEM pipeline ID
- P1295
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Harrison County → Panola County | 22 | 12.4 | — | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gemini Carthage Pipeline run?
- Gemini Carthage Pipeline runs from Harrison County to Panola County, crossing United States.
- How long is Gemini Carthage Pipeline?
- Gemini Carthage Pipeline is 22 km long.
- How much gas can Gemini Carthage Pipeline carry?
- Gemini Carthage Pipeline has a design capacity of 12.4 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gemini Carthage Pipeline operating?
- Gemini Carthage Pipeline is operating, having started in 2019.
- Who owns Gemini Carthage Pipeline?
- Gemini Carthage Pipeline is owned by Gemini Carthage Pipeline LLC, as recorded in the current tracker release.