Gas transmission pipeline · Habshan to Sweihan
ESTIDAMA Gas Pipeline
ESTIDAMA Gas Pipeline is an under construction gas transmission pipeline in United Arab Emirates. The tracker lists 1 tracked segment, 197 km long, starting up in 2026. It runs from Habshan to Sweihan. It is owned by ADNOC.
Length
197 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1422 mm (56 in)
Route
ESTIDAMA Gas Pipeline runs from Habshan to Sweihan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Habshan
- To
- Sweihan
- Start country
- United Arab Emirates
- End country
- United Arab Emirates
- Countries crossed
- United Arab Emirates
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 205 km
- GEM pipeline ID
- P5670
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Package 3 | Under construction | Habshan → Sweihan | 197 | Not reported | 1422 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- ADNOC100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does ESTIDAMA Gas Pipeline run?
- ESTIDAMA Gas Pipeline runs from Habshan to Sweihan, crossing United Arab Emirates.
- How long is ESTIDAMA Gas Pipeline?
- ESTIDAMA Gas Pipeline is 197 km long.
- How much gas can ESTIDAMA Gas Pipeline carry?
- No design capacity is reported for ESTIDAMA Gas Pipeline. That is an absent figure, not a zero.
- Is ESTIDAMA Gas Pipeline operating?
- ESTIDAMA Gas Pipeline is under construction, with a reported start year of 2026.
- Who owns ESTIDAMA Gas Pipeline?
- ESTIDAMA Gas Pipeline is owned by ADNOC, as recorded in the current tracker release.