Gas transmission pipeline · Krasnodar Krai to Krasnodar Krai

Dzhubga-Lazarevskoye-Sochi Gas Pipeline

Dzhubga-Lazarevskoye-Sochi Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 172 km long and 3.8 bcm/y of capacity, starting up in 2011. It runs from Krasnodar Krai to Krasnodar Krai. It is owned by Gazprom PJSC.

Length

172 km

Capacity

3.8 bcm/y

2.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 13462 mm (530 in)

Route

Dzhubga-Lazarevskoye-Sochi Gas Pipeline runs from Krasnodar Krai to Krasnodar Krai. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Krasnodar Krai
To
Krasnodar Krai
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
142 km
GEM pipeline ID
P0743
Start year
2011
Estimated cost (GEM, US dollars)
$441 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingKrasnodar Krai → Krasnodar Krai1723.813462 mm2011GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Chernomorsky LNG TerminalRussiaExportShelved3.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Dzhubga-Lazarevskoye-Sochi Gas Pipeline run?
Dzhubga-Lazarevskoye-Sochi Gas Pipeline runs from Krasnodar Krai to Krasnodar Krai, crossing Russia.
How long is Dzhubga-Lazarevskoye-Sochi Gas Pipeline?
Dzhubga-Lazarevskoye-Sochi Gas Pipeline is 172 km long.
How much gas can Dzhubga-Lazarevskoye-Sochi Gas Pipeline carry?
Dzhubga-Lazarevskoye-Sochi Gas Pipeline has a design capacity of 3.8 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Dzhubga-Lazarevskoye-Sochi Gas Pipeline operating?
Dzhubga-Lazarevskoye-Sochi Gas Pipeline is operating, having started in 2011.
Who owns Dzhubga-Lazarevskoye-Sochi Gas Pipeline?
Dzhubga-Lazarevskoye-Sochi Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
Does Dzhubga-Lazarevskoye-Sochi Gas Pipeline serve an LNG terminal?
Dzhubga-Lazarevskoye-Sochi Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Russia

Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail