Gas transmission pipeline · Nizhny Novgorod Oblast to Kaluga Oblast
Gorky-Center Gas Pipeline
Gorky-Center Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 550 km long and 15.6 bcm/y of capacity, starting up in 1974. It runs from Nizhny Novgorod Oblast to Kaluga Oblast. It is owned by Gazprom PJSC.
Length
550 km
Capacity
15.6 bcm/y
11.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 30480 mm (1200 in)
Route
Gorky-Center Gas Pipeline runs from Nizhny Novgorod Oblast to Kaluga Oblast. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Nizhny Novgorod Oblast
- To
- Kaluga Oblast
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 640 km
- GEM pipeline ID
- P2309
- Start year
- 1974
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Nizhny Novgorod Oblast → Kaluga Oblast | 550 | 15.6 | 30480 mm | 1974 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Yokkaichi LNG Center | Japan | Import | Operating | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Gorky-Center Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Gorky-Center Gas Pipeline run?
- Gorky-Center Gas Pipeline runs from Nizhny Novgorod Oblast to Kaluga Oblast, crossing Russia.
- How long is Gorky-Center Gas Pipeline?
- Gorky-Center Gas Pipeline is 550 km long.
- How much gas can Gorky-Center Gas Pipeline carry?
- Gorky-Center Gas Pipeline has a design capacity of 15.6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Gorky-Center Gas Pipeline operating?
- Gorky-Center Gas Pipeline is operating, having started in 1974.
- Who owns Gorky-Center Gas Pipeline?
- Gorky-Center Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
- Does Gorky-Center Gas Pipeline serve an LNG terminal?
- Gorky-Center Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Gorky-Cherepovets Gas PipelineNizhny Novgorod Oblast to Vologda Oblast · 582 km
- Gorky-Cherepovets Gas PipelineYaroslavl region to Yaroslavl Oblast · 60 km
- Gryazovets-Leningrad Gas Pipeline609 km
- Dzhubga-Lazarevskoye-Sochi Gas PipelineKrasnodar Krai to Krasnodar Krai · 172 km
- Dzuarikau-Tskhinvali Gas PipelineRepublic of North Ossetia to Republic of South Ossetia · 162 km
- Gdov-Slantsy Gas PipelinePskov Oblast to Leningrad Oblast · 44 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.