Gas transmission pipeline · Chelyabinsk region to Sverdlovsk Oblast
Dolgoderevenskoye-Sysert Gas Pipeline
Dolgoderevenskoye-Sysert Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 127 km long. It runs from Chelyabinsk region to Sverdlovsk Oblast. It is owned by Gazprom PJSC.
Length
127 km
Capacity
Not reported
Segments tracked
1
Largest diameter 25908 mm (1020 in)
Route
Dolgoderevenskoye-Sysert Gas Pipeline runs from Chelyabinsk region to Sverdlovsk Oblast. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Chelyabinsk region
- To
- Sverdlovsk Oblast
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 134 km
- GEM pipeline ID
- P2297
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Chelyabinsk region → Sverdlovsk Oblast | 127 | Not reported | 25908 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Dolgoderevenskoye-Sysert Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Dolgoderevenskoye-Sysert Gas Pipeline run?
- Dolgoderevenskoye-Sysert Gas Pipeline runs from Chelyabinsk region to Sverdlovsk Oblast, crossing Russia.
- How long is Dolgoderevenskoye-Sysert Gas Pipeline?
- Dolgoderevenskoye-Sysert Gas Pipeline is 127 km long.
- How much gas can Dolgoderevenskoye-Sysert Gas Pipeline carry?
- No design capacity is reported for Dolgoderevenskoye-Sysert Gas Pipeline. That is an absent figure, not a zero.
- Is Dolgoderevenskoye-Sysert Gas Pipeline operating?
- Dolgoderevenskoye-Sysert Gas Pipeline is operating.
- Who owns Dolgoderevenskoye-Sysert Gas Pipeline?
- Dolgoderevenskoye-Sysert Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Dombarovka-Orenburg Gas PipelineOrenburg Oblast to Orenburg Oblast · 389 km
- Dzhubga-Lazarevskoye-Sochi Gas PipelineKrasnodar Krai to Krasnodar Krai · 172 km
- Dzuarikau-Tskhinvali Gas PipelineRepublic of North Ossetia to Republic of South Ossetia · 162 km
- China-Russia Binhai-Jilin Overseas Landing Gas Pipeline80 km
- CS-12-Ust-Vym-Chasovo-Zelenets-Syktyvkar Gas PipelineRepublic of Komi to Komi Republic · 77 km
- Dashava-Kiev-Bryansk-Moscow Gas Pipeline1,301 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.