Gas transmission pipeline · Poker Lake Metering Station to Lea County
Double E Pipeline Project
Double E Pipeline Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 32 km long and 6.13 bcm/y of capacity, starting up in 2023. It runs from Poker Lake Metering Station to Lea County. It is owned by Summit Midstream Partners LP and ExxonMobil.
Length
32 km
Capacity
6.13 bcm/y
4.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Double E Pipeline Project runs from Poker Lake Metering Station to Lea County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Poker Lake Metering Station
- To
- Lea County
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 32 km
- GEM pipeline ID
- P5727
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Red Hills Lateral | Proposed | Poker Lake Metering Station → Lea County | 32 | 6.13 | 610 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cambodia LNG Project | Cambodia | Import | Cancelled | — | name match |
| Filipinas LNG Gateway Project FSRU | Philippines | Import | Shelved | — | name match |
| Project Venezuela LNG Terminal | Venezuela | Export | Cancelled | — | name match |
| Yakutia LNG Project | Russia | Export | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Double E Pipeline Project run?
- Double E Pipeline Project runs from Poker Lake Metering Station to Lea County, crossing United States.
- How long is Double E Pipeline Project?
- Double E Pipeline Project is 32 km long.
- How much gas can Double E Pipeline Project carry?
- Double E Pipeline Project has a design capacity of 6.13 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Double E Pipeline Project operating?
- Double E Pipeline Project is proposed, with a reported start year of 2023.
- Who owns Double E Pipeline Project?
- Double E Pipeline Project is owned by Summit Midstream Partners LP and ExxonMobil, as recorded in the current tracker release.
- Does Double E Pipeline Project serve an LNG terminal?
- Double E Pipeline Project passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.