Gas transmission pipeline · Libhošť to Kędzierzyn
Czech-Polish Interconnector Gas Pipeline (CPI)
Czech-Polish Interconnector Gas Pipeline (CPI) is a proposed gas transmission pipeline crossing Czechia, Poland. The tracker lists 1 tracked segment, 207 km long, starting up in 2022. It runs from Libhošť to Kędzierzyn. It is owned by Net4Gas and Gaz-System.
Length
207 km
Capacity
Not reported
Segments tracked
1
Largest diameter 991 mm (39 in)
Route
Czech-Polish Interconnector Gas Pipeline (CPI) runs from Libhošť to Kędzierzyn. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Libhošť
- To
- Kędzierzyn
- Start country
- Czech Republic
- End country
- Poland
- Countries crossed
- Czechia, Poland
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 233 km
- GEM pipeline ID
- P1699
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Libhošť → Kędzierzyn | 207 | Not reported | 991 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Polish Baltic Sea Coast FSRU | Poland | Import | Under construction | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Czech-Polish Interconnector Gas Pipeline (CPI) run?
- Czech-Polish Interconnector Gas Pipeline (CPI) runs from Libhošť to Kędzierzyn, crossing Czechia and Poland.
- How long is Czech-Polish Interconnector Gas Pipeline (CPI)?
- Czech-Polish Interconnector Gas Pipeline (CPI) is 207 km long.
- How much gas can Czech-Polish Interconnector Gas Pipeline (CPI) carry?
- No design capacity is reported for Czech-Polish Interconnector Gas Pipeline (CPI). That is an absent figure, not a zero.
- Is Czech-Polish Interconnector Gas Pipeline (CPI) operating?
- Czech-Polish Interconnector Gas Pipeline (CPI) is proposed, with a reported start year of 2022.
- Who owns Czech-Polish Interconnector Gas Pipeline (CPI)?
- Czech-Polish Interconnector Gas Pipeline (CPI) is owned by Gaz-System and Net4Gas, as recorded in the current tracker release.
- Does Czech-Polish Interconnector Gas Pipeline (CPI) serve an LNG terminal?
- Czech-Polish Interconnector Gas Pipeline (CPI) passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.