Gas transmission pipeline · Libhošť to Kędzierzyn

Czech-Polish Interconnector Gas Pipeline (CPI)

Czech-Polish Interconnector Gas Pipeline (CPI) is a proposed gas transmission pipeline crossing Czechia, Poland. The tracker lists 1 tracked segment, 207 km long, starting up in 2022. It runs from Libhošť to Kędzierzyn. It is owned by Net4Gas and Gaz-System.

Length

207 km

Capacity

Not reported

Segments tracked

1

Largest diameter 991 mm (39 in)

Route

Czech-Polish Interconnector Gas Pipeline (CPI) runs from Libhošť to Kędzierzyn. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Libhošť
To
Kędzierzyn
Start country
Czech Republic
End country
Poland
Countries crossed
Czechia, Poland
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
233 km
GEM pipeline ID
P1699
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedLibhošť → Kędzierzyn207Not reported991 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Polish Baltic Sea Coast FSRUPolandImportUnder constructionname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Czech-Polish Interconnector Gas Pipeline (CPI) run?
Czech-Polish Interconnector Gas Pipeline (CPI) runs from Libhošť to Kędzierzyn, crossing Czechia and Poland.
How long is Czech-Polish Interconnector Gas Pipeline (CPI)?
Czech-Polish Interconnector Gas Pipeline (CPI) is 207 km long.
How much gas can Czech-Polish Interconnector Gas Pipeline (CPI) carry?
No design capacity is reported for Czech-Polish Interconnector Gas Pipeline (CPI). That is an absent figure, not a zero.
Is Czech-Polish Interconnector Gas Pipeline (CPI) operating?
Czech-Polish Interconnector Gas Pipeline (CPI) is proposed, with a reported start year of 2022.
Who owns Czech-Polish Interconnector Gas Pipeline (CPI)?
Czech-Polish Interconnector Gas Pipeline (CPI) is owned by Gaz-System and Net4Gas, as recorded in the current tracker release.
Does Czech-Polish Interconnector Gas Pipeline (CPI) serve an LNG terminal?
Czech-Polish Interconnector Gas Pipeline (CPI) passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.