Gas transmission pipeline · Czechia

Moravia Extension Gas Pipeline

Moravia Extension Gas Pipeline is a proposed gas transmission pipeline in Czechia. The tracker lists 1 tracked segment, 74 km long and 2.58 bcm/y of capacity, starting up in 2027. It is owned by Net4Gas.

Length

74 km

Capacity

2.58 bcm/y

1.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 25400 mm (1000 in)

Route

No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.

From
Not reported
To
Not reported
Start country
Czech Republic
End country
Czech Republic
Countries crossed
Czechia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
Not reported
GEM pipeline ID
P5918
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Stage 2ProposedNot reported742.5825400 mm2027No route

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Moravia Extension Gas Pipeline run?
Moravia Extension Gas Pipeline is recorded in Czechia. Global Energy Monitor reports no start and end points for it.
How long is Moravia Extension Gas Pipeline?
Moravia Extension Gas Pipeline is 74 km long.
How much gas can Moravia Extension Gas Pipeline carry?
Moravia Extension Gas Pipeline has a design capacity of 2.58 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Moravia Extension Gas Pipeline operating?
Moravia Extension Gas Pipeline is proposed, with a reported start year of 2027.
Who owns Moravia Extension Gas Pipeline?
Moravia Extension Gas Pipeline is owned by Net4Gas, as recorded in the current tracker release.

More gas pipelines in Czechia

Listed in name order among the 14 pipelines tracked in Czechia, so projects with the same name sit together. A browse aid, not a claim that they are alike.