Gas transmission pipeline · Chubut to Chubut
Cordillerano-Patagónico Gas Pipeline
Cordillerano-Patagónico Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 600 km long and 0.37 bcm/y of capacity, starting up in 2006. It runs from Chubut to Chubut. It is owned by Camuzzi Gas del Sur SA.
Length
600 km
Capacity
0.37 bcm/y
0.3 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 254 mm (10 in)
Route
Cordillerano-Patagónico Gas Pipeline runs from Chubut to Chubut. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Chubut
- To
- Chubut
- Start country
- Argentina
- End country
- Argentina
- Countries crossed
- Argentina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 656 km
- GEM pipeline ID
- P2712
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Patagónico (South) | Operating | Chubut → Chubut | 600 | 0.37 | 254 mm | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Cordillerano-Patagónico Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Cordillerano-Patagónico Gas Pipeline run?
- Cordillerano-Patagónico Gas Pipeline runs from Chubut to Chubut, crossing Argentina.
- How long is Cordillerano-Patagónico Gas Pipeline?
- Cordillerano-Patagónico Gas Pipeline is 600 km long.
- How much gas can Cordillerano-Patagónico Gas Pipeline carry?
- Cordillerano-Patagónico Gas Pipeline has a design capacity of 0.37 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Cordillerano-Patagónico Gas Pipeline operating?
- Cordillerano-Patagónico Gas Pipeline is operating, having started in 2006.
- Who owns Cordillerano-Patagónico Gas Pipeline?
- Cordillerano-Patagónico Gas Pipeline is owned by Camuzzi Gas del Sur SA, as recorded in the current tracker release.
More gas pipelines in Argentina
Listed in name order among the 50 pipelines tracked in Argentina, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Entrerriano Gas PipelineEntre Ríos to Entre Ríos · 436 km
- Fénix Gas PipelineTierra del Fuego to Tierra del Fuego · 35 km
- GasAndes PipelineMendoza to Santiago · 533 km
- Centro Oeste Gas PipelineNeuquén to Santa Fe · 1,121 km
- Chelforó-Conesa Gas PipelineRío Negro to Río Negro · 220 km
- Cordillerano-Patagónico Gas PipelineNeuquén to Chubut · 940 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.