LNG Chain

Gas transmission pipeline · Plaza Huincul to Chubut

Cordillerano-Patagónico Gas Pipeline

Cordillerano-Patagónico Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 940 km long and 0.48 bcm/y of capacity, starting up in 1986. It runs from Plaza Huincul to Chubut. Owners include CIESA-Compañía de Inversiones de Energía SA, ANSES-Administración Nacional de la Seguridad Social, NYSE-New York Stock Exchange and 2 more.

Length

940 km

Capacity

0.48 bcm/y

0.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 203 mm (8.0 in)

Route

Cordillerano-Patagónico Gas Pipeline runs from Plaza Huincul to Chubut. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Plaza Huincul
To
Chubut
Start country
Argentina
End country
Argentina
Countries crossed
Argentina
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
1,091 km
GEM pipeline ID
P2711
Start year
1986
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Cordillerano (North)OperatingPlaza Huincul → Chubut9400.48203 mm1986GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Cordillerano-Patagónico Gas Pipeline run?
Cordillerano-Patagónico Gas Pipeline runs from Plaza Huincul to Chubut, crossing Argentina.
How long is Cordillerano-Patagónico Gas Pipeline?
Cordillerano-Patagónico Gas Pipeline is 940 km long.
How much gas can Cordillerano-Patagónico Gas Pipeline carry?
Cordillerano-Patagónico Gas Pipeline has a design capacity of 0.48 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Cordillerano-Patagónico Gas Pipeline operating?
Cordillerano-Patagónico Gas Pipeline is operating, having started in 1986.
Who owns Cordillerano-Patagónico Gas Pipeline?
Cordillerano-Patagónico Gas Pipeline is owned by CIESA-Compañía de Inversiones de Energía SA, ANSES-Administración Nacional de la Seguridad Social, NYSE-New York Stock Exchange and 2 others, as recorded in the current tracker release.