Central Rich and Lean Gas Pipeline is an operating gas transmission pipeline in Oman. The tracker lists 1 tracked segment, 65 km long and 6 bcm/y of capacity, starting up in 2025. It runs from Ash Sharqiyah South Governorate to Ash Sharqiyah South. It is owned by OQGN.

Length

65 km

Capacity

6 bcm/y

4.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

Central Rich and Lean Gas Pipeline runs from Ash Sharqiyah South Governorate to Ash Sharqiyah South. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Ash Sharqiyah South Governorate
To
Ash Sharqiyah South
Start country
Oman
End country
Oman
Countries crossed
Oman
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
46 km
GEM pipeline ID
P7719
Start year
2025
Estimated cost (GEM, US dollars)
$104 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingAsh Sharqiyah South Governorate → Ash Sharqiyah South6561219 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Oman Qalhat LNG TerminalOmanExportOperating2.9 kmroute proximity
Central Java FSRUIndonesiaImportCancelled—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Central Rich and Lean Gas Pipeline run?
Central Rich and Lean Gas Pipeline runs from Ash Sharqiyah South Governorate to Ash Sharqiyah South, crossing Oman.
How long is Central Rich and Lean Gas Pipeline?
Central Rich and Lean Gas Pipeline is 65 km long.
How much gas can Central Rich and Lean Gas Pipeline carry?
Central Rich and Lean Gas Pipeline has a design capacity of 6 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Central Rich and Lean Gas Pipeline operating?
Central Rich and Lean Gas Pipeline is operating, having started in 2025.
Who owns Central Rich and Lean Gas Pipeline?
Central Rich and Lean Gas Pipeline is owned by OQGN, as recorded in the current tracker release.
Does Central Rich and Lean Gas Pipeline serve an LNG terminal?
Central Rich and Lean Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Oman

Listed in name order among the 21 pipelines tracked in Oman, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail