Gas transmission pipeline · Fahud Compresor Station to Block Valve Station (BVS-06)
Fahud-Sohar Gas Pipeline
Fahud-Sohar Gas Pipeline is a proposed gas transmission pipeline in Oman. The tracker lists 1 tracked segment, 193 km long and 4.75 bcm/y of capacity, starting up in 2027. It runs from Fahud Compresor Station to Block Valve Station (BVS-06). It is owned by OQGN.
Length
193 km
Capacity
4.75 bcm/y
3.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Fahud-Sohar Gas Pipeline runs from Fahud Compresor Station to Block Valve Station (BVS-06). The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Fahud Compresor Station
- To
- Block Valve Station (BVS-06)
- Start country
- Oman
- End country
- Oman
- Countries crossed
- Oman
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 186 km
- GEM pipeline ID
- P5747
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Loop Line | Proposed | Fahud Compresor Station → Block Valve Station (BVS-06) | 193 | 4.75 | 1067 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Fahud-Sohar Gas Pipeline run?
- Fahud-Sohar Gas Pipeline runs from Fahud Compresor Station to Block Valve Station (BVS-06), crossing Oman.
- How long is Fahud-Sohar Gas Pipeline?
- Fahud-Sohar Gas Pipeline is 193 km long.
- How much gas can Fahud-Sohar Gas Pipeline carry?
- Fahud-Sohar Gas Pipeline has a design capacity of 4.75 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Fahud-Sohar Gas Pipeline operating?
- Fahud-Sohar Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Fahud-Sohar Gas Pipeline?
- Fahud-Sohar Gas Pipeline is owned by OQGN, as recorded in the current tracker release.