Gas transmission pipeline · Ad Dakhiliyah to Ad Dakhiliyah
Fahud-Sohar Gas Pipeline
Fahud-Sohar Gas Pipeline is a proposed gas transmission pipeline in Oman. The tracker lists 1 tracked segment, 193 km long and 4.75 bcm/y of capacity, starting up in 2027. It runs from Ad Dakhiliyah to Ad Dakhiliyah. It is owned by OQGN.
Length
193 km
Capacity
4.75 bcm/y
3.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Fahud-Sohar Gas Pipeline runs from Ad Dakhiliyah to Ad Dakhiliyah. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ad Dakhiliyah
- To
- Ad Dakhiliyah
- Start country
- Oman
- End country
- Oman
- Countries crossed
- Oman
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 186 km
- GEM pipeline ID
- P5747
- Start year
- 2027
- Estimated cost (GEM, US dollars)
- $273 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Loop Line | Proposed | Ad Dakhiliyah → Ad Dakhiliyah | 193 | 4.75 | 1067 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
In the news
Recent headlines that name Fahud-Sohar Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Fahud-Sohar Gas Pipeline run?
- Fahud-Sohar Gas Pipeline runs from Ad Dakhiliyah to Ad Dakhiliyah, crossing Oman.
- How long is Fahud-Sohar Gas Pipeline?
- Fahud-Sohar Gas Pipeline is 193 km long.
- How much gas can Fahud-Sohar Gas Pipeline carry?
- Fahud-Sohar Gas Pipeline has a design capacity of 4.75 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Fahud-Sohar Gas Pipeline operating?
- Fahud-Sohar Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Fahud-Sohar Gas Pipeline?
- Fahud-Sohar Gas Pipeline is owned by OQGN, as recorded in the current tracker release.
More gas pipelines in Oman
Listed in name order among the 21 pipelines tracked in Oman, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Fahud-Sohar Gas PipelineAd Dakhiliyah to Al Batinah North · 300 km
- Kauther-Fahud Gas PipelineAd Dakhiliyah to Ad Dakhiliyah · 85 km
- Khazzan-Saih Nihayda Gas PipelineAl Dhahirah to Ad Dakhiliyah · 60 km
- Central Rich and Lean Gas PipelineAsh Sharqiyah South Governorate to Ash Sharqiyah South · 65 km
- Duqm SEZ Gas PipelineAl Wusta to Al Wusta · 17 km
- Fahud-Sohar Gas PipelineAl Dhahirah to Al Batinah North · 301 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.