Export terminal · Djibouti
Djibouti FLNG Terminal
Djibouti FLNG Terminal is a cancelled LNG export terminal (floating liquefaction (FLNG) facility) in Djibouti. The tracker lists 3 tracked units; capacity is not reported. It is owned by GCL Technology Holdings Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| T1 | Cancelled | 3 | 4.08 | — | — | Not reported | GCL Technology Holdings Ltd [100%] |
| T2 | Cancelled | 3 | 4.08 | — | — | Not reported | GCL Technology Holdings Ltd [100%] |
| T3 | Cancelled | 4 | 5.44 | — | — | Not reported | GCL Technology Holdings Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 3 | 10 | 13.6 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Parent companies
Reported cost
Global Energy Monitor's estimated cost for each unit that reports one, converted to US dollars. Estimates at the date GEM last updated the unit, not adjusted for inflation.
| Unit | Status | Capacity | Estimated cost | Per tonne a year |
|---|---|---|---|---|
| T1 | Cancelled | 3 Mtpa | $2.9 billion | $967 |
| T2 | Cancelled | 3 Mtpa | $550 million | $183 |
| T3 | Cancelled | 4 Mtpa | $550 million | $138 |
A unit with no cost reported is not shown, and the figures are never added across statuses. How the estimates compare is on project costs.
Location
Djibouti FLNG Terminal at 11.4821° N, 43.1869° E, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 11.4821° N, 43.1869° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Ethiopia–Djibouti Gas Pipeline | Cancelled | 767 km | 12 bcm/y | 2.6 km | route proximity |
In the news
Recent headlines that name Djibouti FLNG Terminal. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Djibouti FLNG Terminal?
- Djibouti FLNG Terminal is an LNG export terminal in Djibouti. It is made up of 3 tracked trains and phases.
- Is Djibouti FLNG Terminal operating?
- Djibouti FLNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Djibouti FLNG Terminal handle?
- Global Energy Monitor reports no capacity for Djibouti FLNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Djibouti FLNG Terminal?
- Djibouti FLNG Terminal is owned by GCL Technology Holdings Ltd. Shares are as recorded in the current tracker release.
- What pipelines connect to Djibouti FLNG Terminal?
- 1 tracked gas pipeline passes within 25 km of Djibouti FLNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.