Export terminal · Djibouti
Djibouti FLNG Terminal
Djibouti FLNG Terminal is a cancelled LNG export terminal (floating liquefaction (FLNG) facility) in Djibouti. The tracker lists 3 tracked units; capacity is not reported. It is owned by GCL Technology Holdings Ltd.
Operating
—
no units operating
Under construction
—
no units under construction
Proposed
—
no units proposed
At a glance
Trains and phases
Each row is one unit as tracked by GEM. Ordered by start year, then proposal year.
| Unit | Status | Capacity (Mtpa) | Capacity (bcm/y) | Start | Proposed | FID | Owner (as reported) |
|---|---|---|---|---|---|---|---|
| Unit T1 | Cancelled | 3 | 4.08 | — | — | Not reported | GCL Technology Holdings Ltd [100%] |
| Unit T2 | Cancelled | 3 | 4.08 | — | — | Not reported | GCL Technology Holdings Ltd [100%] |
| Unit T3 | Cancelled | 4 | 5.44 | — | — | Not reported | GCL Technology Holdings Ltd [100%] |
Capacity by status
| Status | Units | Mtpa | bcm/y |
|---|---|---|---|
| Cancelled | 3 | 10 | 13.6 |
Owners and operators
Stakes as reported by GEM per unit, merged across units. Percentages are omitted where GEM does not give them.
Owners
Location
Djibouti FLNG Terminal at 11.4821° N, 43.1869° E, with 1 tracked gas pipeline passing within 25 km.
Loads about 250 kB of map code and the country outline file.
- Coordinates
- 11.4821° N, 43.1869° E
- Coordinate accuracy (GEM)
- approximate
- Open in OpenStreetMap
- View on map
Connected gas pipelines
Tracked pipelines whose route passes within 25 km of this terminal, or whose name matches it. Proximity is not proof of a physical connection.
| Pipeline | Status | Length | Capacity | Distance | Matched by |
|---|---|---|---|---|---|
| Ethiopia–Djibouti Gas Pipeline | Cancelled | 767 km | 12 bcm/y | 2.6 km | route proximity |
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where is Djibouti FLNG Terminal?
- Djibouti FLNG Terminal is an LNG export terminal in Djibouti. It is made up of 3 tracked trains and phases.
- Is Djibouti FLNG Terminal operating?
- Djibouti FLNG Terminal is cancelled. Nothing here should be read as a forecast that it will be built.
- How much LNG can Djibouti FLNG Terminal handle?
- Global Energy Monitor reports no capacity for Djibouti FLNG Terminal, so none is shown. That is an absent figure, not a zero.
- Who owns Djibouti FLNG Terminal?
- Djibouti FLNG Terminal is owned by GCL Technology Holdings Ltd. Shares are as recorded in the current tracker release.
- What pipelines connect to Djibouti FLNG Terminal?
- 1 tracked gas pipeline passes within 25 km of Djibouti FLNG Terminal. Proximity is not proof of a physical connection; each match is listed with its distance.