Gas transmission pipeline · Jiangxi to Jiangxi
West-East Gas Pipeline 2
West-East Gas Pipeline 2 is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 210 km long and 3 bcm/y of capacity, starting up in 2010. It runs from Jiangxi to Jiangxi. It is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd.
Length
210 km
Capacity
3 bcm/y
2.2 Mtpa LNG equivalent
Segments tracked
1
Route
West-East Gas Pipeline 2 runs from Jiangxi to Jiangxi. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Jiangxi
- To
- Jiangxi
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 150 km
- GEM pipeline ID
- P4794
- Start year
- 2010
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Jiujiang-Gao'an Gas Pipeline | Operating | Jiangxi → Jiangxi | 210 | 3 | — | 2010 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
In the news
Recent headlines that name West-East Gas Pipeline 2. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does West-East Gas Pipeline 2 run?
- West-East Gas Pipeline 2 runs from Jiangxi to Jiangxi, crossing China.
- How long is West-East Gas Pipeline 2?
- West-East Gas Pipeline 2 is 210 km long.
- How much gas can West-East Gas Pipeline 2 carry?
- West-East Gas Pipeline 2 has a design capacity of 3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is West-East Gas Pipeline 2 operating?
- West-East Gas Pipeline 2 is operating, having started in 2010.
- Who owns West-East Gas Pipeline 2?
- West-East Gas Pipeline 2 is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd, as recorded in the current tracker release.
More gas pipelines in China
Listed in name order among the 968 pipelines tracked in China, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- West-East Gas Pipeline 2Jiangxi to Jiangxi · 125 km
- West-East Gas Pipeline 2Jiangxi to Jiangxi · 137 km
- West-East Gas Pipeline 2Jiangxi to Jiangxi · 40 km
- West-East Gas Pipeline 1Jiangsu to Jiangsu · 276 km
- West-East Gas Pipeline 2Xinjiang to Xinjiang · 526 km
- West-East Gas Pipeline 2Jiangxi to Jiangxi · 174 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.