West-East Gas Pipeline 1 is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 276 km long and 13.5 bcm/y of capacity, starting up in 2011. It runs from Jiangdu District to Rudong. It is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd.

Length

276 km

Capacity

13.5 bcm/y

9.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

West-East Gas Pipeline 1 runs from Jiangdu District to Rudong. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jiangdu District
To
Rudong
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
221 km
GEM pipeline ID
P5996
Start year
2011
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Jiangdu-Rudong Gas PipelineOperatingJiangdu District → Rudong27613.51016 mm2011GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Zhangjiagang LNG TerminalChinaImportUnder construction19.4 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does West-East Gas Pipeline 1 run?
West-East Gas Pipeline 1 runs from Jiangdu District to Rudong, crossing China.
How long is West-East Gas Pipeline 1?
West-East Gas Pipeline 1 is 276 km long.
How much gas can West-East Gas Pipeline 1 carry?
West-East Gas Pipeline 1 has a design capacity of 13.5 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is West-East Gas Pipeline 1 operating?
West-East Gas Pipeline 1 is operating, having started in 2011.
Who owns West-East Gas Pipeline 1?
West-East Gas Pipeline 1 is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd, as recorded in the current tracker release.
Does West-East Gas Pipeline 1 serve an LNG terminal?
West-East Gas Pipeline 1 passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.