Gas transmission pipeline · Libya
Wafa-Mellitah Gas Pipeline
Wafa-Mellitah Gas Pipeline is an operating gas transmission pipeline in Libya. The tracker lists 1 tracked segment, 525 km long, starting up in 2004. It is owned by Libyan National Oil Corp.
Length
525 km
Capacity
Not reported
Segments tracked
1
Largest diameter 406 mm (16 in)
Route
Wafa-Mellitah Gas Pipeline runs from Libya. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Libya
- End country
- Libya
- Countries crossed
- Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 527 km
- GEM pipeline ID
- P6705
- Start year
- 2004
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Pipeline 2 | Operating | Not reported | 525 | Not reported | 406 mm | 2004 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Wafa-Mellitah Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Wafa-Mellitah Gas Pipeline run?
- Wafa-Mellitah Gas Pipeline is recorded in Libya. Global Energy Monitor reports no start and end points for it.
- How long is Wafa-Mellitah Gas Pipeline?
- Wafa-Mellitah Gas Pipeline is 525 km long.
- How much gas can Wafa-Mellitah Gas Pipeline carry?
- No design capacity is reported for Wafa-Mellitah Gas Pipeline. That is an absent figure, not a zero.
- Is Wafa-Mellitah Gas Pipeline operating?
- Wafa-Mellitah Gas Pipeline is operating, having started in 2004.
- Who owns Wafa-Mellitah Gas Pipeline?
- Wafa-Mellitah Gas Pipeline is owned by Libyan National Oil Corp, as recorded in the current tracker release.
More gas pipelines in Libya
Listed in name order among the 37 pipelines tracked in Libya, so projects with the same name sit together. A browse aid, not a claim that they are alike.