Gas transmission pipeline · Tierra del Fuego to Tierra del Fuego
Vega Pléyade Gas Pipeline
Vega Pléyade Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 77 km long and 3.65 bcm/y of capacity, starting up in 2016. It runs from Tierra del Fuego to Tierra del Fuego. It is owned by TotalEnergies, Wintershall Energía and Pan American Energy.
Length
77 km
Capacity
3.65 bcm/y
2.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Vega Pléyade Gas Pipeline runs from Tierra del Fuego to Tierra del Fuego. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tierra del Fuego
- To
- Tierra del Fuego
- Start country
- Argentina
- End country
- Argentina
- Countries crossed
- Argentina
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 109 km
- GEM pipeline ID
- P2082
- Start year
- 2016
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Tierra del Fuego → Tierra del Fuego | 77 | 3.65 | 610 mm | 2016 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- TotalEnergies37.5%
- Wintershall Energía37.5%
- Pan American Energy25%
Parent companies
- TotalEnergies37.5%
- BASF SE27.26%
- BC Energy Investments Corp12.5%
- BP12.5%
- Letterone Investment Holdings SA10.24%
In the news
Recent headlines that name Vega Pléyade Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Vega Pléyade Gas Pipeline run?
- Vega Pléyade Gas Pipeline runs from Tierra del Fuego to Tierra del Fuego, crossing Argentina.
- How long is Vega Pléyade Gas Pipeline?
- Vega Pléyade Gas Pipeline is 77 km long.
- How much gas can Vega Pléyade Gas Pipeline carry?
- Vega Pléyade Gas Pipeline has a design capacity of 3.65 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Vega Pléyade Gas Pipeline operating?
- Vega Pléyade Gas Pipeline is operating, having started in 2016.
- Who owns Vega Pléyade Gas Pipeline?
- Vega Pléyade Gas Pipeline is owned by TotalEnergies, Wintershall Energía and Pan American Energy, as recorded in the current tracker release.
More gas pipelines in Argentina
Listed in name order among the 50 pipelines tracked in Argentina, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Vicuñas Gas PipelineJujuy to Catamarca · 304 km
- Anillo Gran Buenos Aires Gas PipelineBuenos Aires to Buenos Aires · 83 km
- Anillo Gran Buenos Aires Gas PipelineBuenos Aires to Buenos Aires · 29 km
- Second Transmagallánico Gas PipelineTierra del Fuego to Santa Cruz · 37 km
- Southern Cross Gas Pipeline400 km
- Valles Calchaquíes Gas PipelineSalta to Salta · 197 km
Cite this page