LNG Atlas

Gas transmission pipeline · Tierra del Fuego to Santa Cruz

Second Transmagallánico Gas Pipeline

Second Transmagallánico Gas Pipeline is an operating gas transmission pipeline in Argentina. The tracker lists 1 tracked segment, 37 km long and 2.53 bcm/y of capacity, starting up in 2010. It runs from Tierra del Fuego to Santa Cruz. Owners include CIESA-Compañía de Inversiones de Energía SA, ANSES-Administración Nacional de la Seguridad Social, NYSE-New York Stock Exchange and 2 more.

Length

37 km

Capacity

2.53 bcm/y

1.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Second Transmagallánico Gas Pipeline runs from Tierra del Fuego to Santa Cruz. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tierra del Fuego
To
Santa Cruz
Start country
Argentina
End country
Argentina
Countries crossed
Argentina
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
47 km
GEM pipeline ID
P1370
Start year
2010
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingTierra del Fuego → Santa Cruz372.53610 mm2010GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Second Transmagallánico Gas Pipeline run?
Second Transmagallánico Gas Pipeline runs from Tierra del Fuego to Santa Cruz, crossing Argentina.
How long is Second Transmagallánico Gas Pipeline?
Second Transmagallánico Gas Pipeline is 37 km long.
How much gas can Second Transmagallánico Gas Pipeline carry?
Second Transmagallánico Gas Pipeline has a design capacity of 2.53 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Second Transmagallánico Gas Pipeline operating?
Second Transmagallánico Gas Pipeline is operating, having started in 2010.
Who owns Second Transmagallánico Gas Pipeline?
Second Transmagallánico Gas Pipeline is owned by CIESA-Compañía de Inversiones de Energía SA, ANSES-Administración Nacional de la Seguridad Social, NYSE-New York Stock Exchange and 2 others, as recorded in the current tracker release.

More gas pipelines in Argentina

Listed in name order among the 50 pipelines tracked in Argentina, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail