Gas transmission pipeline · Urengoy to Chelyabinsk
Urengoy-Chelyabinsk Gas Pipeline
Urengoy-Chelyabinsk Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,780 km long and 58 bcm/y of capacity, starting up in 1979. It runs from Urengoy to Chelyabinsk. It is owned by Gazprom PJSC.
Length
1,780 km
Capacity
58 bcm/y
42.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1420 mm (56 in)
Route
Urengoy-Chelyabinsk Gas Pipeline runs from Urengoy to Chelyabinsk. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Urengoy
- To
- Chelyabinsk
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 1,740 km
- GEM pipeline ID
- P2440
- Start year
- 1979
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Urengoy → Chelyabinsk | 1,780 | 58 | 1420 mm | 1979 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Urengoy-Chelyabinsk Gas Pipeline run?
- Urengoy-Chelyabinsk Gas Pipeline runs from Urengoy to Chelyabinsk, crossing Russia.
- How long is Urengoy-Chelyabinsk Gas Pipeline?
- Urengoy-Chelyabinsk Gas Pipeline is 1,780 km long.
- How much gas can Urengoy-Chelyabinsk Gas Pipeline carry?
- Urengoy-Chelyabinsk Gas Pipeline has a design capacity of 58 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Urengoy-Chelyabinsk Gas Pipeline operating?
- Urengoy-Chelyabinsk Gas Pipeline is operating, having started in 1979.
- Who owns Urengoy-Chelyabinsk Gas Pipeline?
- Urengoy-Chelyabinsk Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.