LNG Chain

Gas transmission pipeline · Tyukalinsk to Nazyvaevsk

Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline

Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline is an under construction gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 98 km long and 0.04 bcm/y of capacity, starting up in 2023. It runs from Tyukalinsk to Nazyvaevsk. It is owned by Gazprom PJSC.

Length

98 km

Capacity

0.04 bcm/y

0.0 Mtpa LNG equivalent

Segments tracked

1

Route

Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline runs from Tyukalinsk to Nazyvaevsk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tyukalinsk
To
Nazyvaevsk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
65 km
GEM pipeline ID
P3982
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionTyukalinsk → Nazyvaevsk980.042023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline run?
Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline runs from Tyukalinsk to Nazyvaevsk, crossing Russia.
How long is Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline?
Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline is 98 km long.
How much gas can Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline carry?
Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline has a design capacity of 0.04 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline operating?
Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline is under construction, with a reported start year of 2023.
Who owns Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline?
Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.