LNG Chain

Gas transmission pipeline · Balkanabat to Sangachal Terminal

Trans-Caspian Gas Pipeline

Trans-Caspian Gas Pipeline is a proposed gas transmission pipeline crossing Turkmenistan, Azerbaijan. The tracker lists 1 tracked segment, 300 km long and 16 bcm/y of capacity, starting up in 2029. It runs from Balkanabat to Sangachal Terminal. It is owned by W-Stream Caspian Pipeline Co Ltd.

Length

300 km

Capacity

16 bcm/y

11.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 915 mm (36 in)

Route

Trans-Caspian Gas Pipeline runs from Balkanabat to Sangachal Terminal. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Balkanabat
To
Sangachal Terminal
Start country
Turkmenistan
End country
Azerbaijan
Countries crossed
Turkmenistan, Azerbaijan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
436 km
GEM pipeline ID
P0764
Start year
2029
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase IProposedBalkanabat → Sangachal Terminal30016915 mm2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Trans-Caspian Gas Pipeline run?
Trans-Caspian Gas Pipeline runs from Balkanabat to Sangachal Terminal, crossing Turkmenistan and Azerbaijan.
How long is Trans-Caspian Gas Pipeline?
Trans-Caspian Gas Pipeline is 300 km long.
How much gas can Trans-Caspian Gas Pipeline carry?
Trans-Caspian Gas Pipeline has a design capacity of 16 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Trans-Caspian Gas Pipeline operating?
Trans-Caspian Gas Pipeline is proposed, with a reported start year of 2029.
Who owns Trans-Caspian Gas Pipeline?
Trans-Caspian Gas Pipeline is owned by W-Stream Caspian Pipeline Co Ltd, as recorded in the current tracker release.