Gas transmission pipeline · Turkmenistan – Uzbekistan – Kazakhstan – Russia
Caspian Coastal Gas Pipeline
Caspian Coastal Gas Pipeline is a cancelled gas transmission pipeline crossing Turkmenistan, Uzbekistan, Kazakhstan and 1 more. The tracker lists 1 tracked segment, 1,996 km long and 25 bcm/y of capacity. Owners include Gazprom PJSC, Turkmengaz, Uzbekneftegaz JSC and 1 more.
Length
1,996 km
Capacity
25 bcm/y
18.4 Mtpa LNG equivalent
Segments tracked
1
Route
Caspian Coastal Gas Pipeline runs from Turkmenistan – Uzbekistan – Kazakhstan – Russia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Turkmenistan
- End country
- Russia
- Countries crossed
- Turkmenistan, Uzbekistan, Kazakhstan, Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 1,995 km
- GEM pipeline ID
- P0740
- Start year
- Not reported
- Cancelled (year GEM records)
- 2010
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Not reported | 1,996 | 25 | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Coastal Bend LNG Terminal | United States | Export | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
In the news
Recent headlines that name Caspian Coastal Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Caspian Coastal Gas Pipeline run?
- Caspian Coastal Gas Pipeline runs from Turkmenistan to Russia, crossing Turkmenistan, Uzbekistan, Kazakhstan and Russia.
- How long is Caspian Coastal Gas Pipeline?
- Caspian Coastal Gas Pipeline is 1,996 km long.
- How much gas can Caspian Coastal Gas Pipeline carry?
- Caspian Coastal Gas Pipeline has a design capacity of 25 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Caspian Coastal Gas Pipeline operating?
- Caspian Coastal Gas Pipeline is cancelled.
- Who owns Caspian Coastal Gas Pipeline?
- Caspian Coastal Gas Pipeline is owned by Gazprom PJSC, Samruk-Kazyna SWF JSC, Turkmengaz and 1 other, as recorded in the current tracker release.
- Does Caspian Coastal Gas Pipeline serve an LNG terminal?
- Caspian Coastal Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Turkmenistan
Listed in name order among the 19 pipelines tracked in Turkmenistan, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Central Asia–Center Gas PipelineMary to Moscow Oblast · 2,662 km
- Central Asia–Center Gas PipelineMangystau to Belogorodsk Oblast · 2,600 km
- Central Asia–Center Gas Pipeline3,700 km
- Trans-Caspian Gas Pipeline300 km
- Trans-Caspian Gas Pipeline0 km
- Turkmenistan-Afghanistan-Pakistan-India Gas PipelineAhal to Punjab · 1,814 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.