LNG Atlas

Gas transmission pipeline · Bangladesh

Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project

Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project is a shelved gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 115 km long, starting up in 2029. It is owned by Gas Transmission Co Ltd (GTCL).

Length

115 km

Capacity

Not reported

Segments tracked

1

Largest diameter 762 mm (30 in)

Route

Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project runs from Bangladesh. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Bangladesh
End country
Bangladesh
Countries crossed
Bangladesh
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
114 km
GEM pipeline ID
P3222
Start year
2029
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineShelvedNot reported115Not reported762 mm2029GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project run?
Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project is recorded in Bangladesh. Global Energy Monitor reports no start and end points for it.
How long is Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project?
Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project is 115 km long.
How much gas can Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project carry?
No design capacity is reported for Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project. That is an absent figure, not a zero.
Is Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project operating?
Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project is shelved, with a reported start year of 2029.
Who owns Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project?
Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project is owned by Gas Transmission Co Ltd (GTCL), as recorded in the current tracker release.
Does Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project serve an LNG terminal?
Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Bangladesh

Listed in name order among the 61 pipelines tracked in Bangladesh, so projects with the same name sit together. A browse aid, not a claim that they are alike.