Gas transmission pipeline · Krasnodar Krai to Udine and Lower Austria
South Stream Gas Pipeline
South Stream Gas Pipeline is a cancelled gas transmission pipeline crossing Russia, Bulgaria, Serbia and 7 more. The tracker lists 1 tracked segment, 2,380 km long and 63 bcm/y of capacity. It runs from Krasnodar Krai to Udine and Lower Austria. It is owned by South Stream BV.
Length
2,380 km
Capacity
63 bcm/y
46.3 Mtpa LNG equivalent
Segments tracked
1
Route
South Stream Gas Pipeline runs from Krasnodar Krai to Udine and Lower Austria. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Krasnodar Krai
- To
- Udine and Lower Austria
- Start country
- Russia
- End country
- Italy
- Countries crossed
- Russia, Bulgaria, Serbia, Hungary, Croatia, Slovakia, Slovenia, Austria, Greece, Italy
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 3,617 km
- GEM pipeline ID
- P0760
- Start year
- Not reported
- Estimated cost (GEM, US dollars)
- $15.5 billion
- Cancelled (year GEM records)
- 2014
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Krasnodar Krai → Udine and Lower Austria | 2,380 | 63 | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Brindisi LNG Terminal | Italy | Import | Cancelled | 5.2 km | route proximity |
| Chernomorsky LNG Terminal | Russia | Export | Shelved | 7.2 km | route proximity |
| Thessaloniki FSRU | Greece | Import | Proposed | 15.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- South Stream BV100%
Parent companies
- Eni100%
In the news
Recent headlines that name South Stream Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does South Stream Gas Pipeline run?
- South Stream Gas Pipeline runs from Krasnodar Krai to Udine and Lower Austria, crossing Russia, Bulgaria, Serbia, Hungary and 6 others.
- How long is South Stream Gas Pipeline?
- South Stream Gas Pipeline is 2,380 km long.
- How much gas can South Stream Gas Pipeline carry?
- South Stream Gas Pipeline has a design capacity of 63 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is South Stream Gas Pipeline operating?
- South Stream Gas Pipeline is cancelled.
- Who owns South Stream Gas Pipeline?
- South Stream Gas Pipeline is owned by South Stream BV, as recorded in the current tracker release.
- Does South Stream Gas Pipeline serve an LNG terminal?
- South Stream Gas Pipeline passes within 25 km of 3 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Soyuz Gas Pipeline2,750 km
- Srednebotuobinskoye-Novolenskaya CHP Gas PipelineSakha Republic to Sakha Republic · 207 km
- Srednetyungskoye-Nakyn Gas PipelineRepublic of Sakha to Republic of Sakha · 160 km
- Sobolevo-Petropavlovsk-Kamchatsky Gas PipelineKamchatka territory to Kamchatka Krai · 392 km
- Sohranovka-Oktyabrskaya Gas PipelineRostov Oblast to Rostov Oblast · 310 km
- Sokol-Kharovsk Gas PipelineVologda Oblast to Vologda Oblast · 65 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.