LNG Chain

Gas transmission pipeline · Srednebotuobinskoye Gas and Condensate Field to Lensk

Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline

Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 207 km long and 1.45 bcm/y of capacity, starting up in 2028. It runs from Srednebotuobinskoye Gas and Condensate Field to Lensk. It is owned by Alrosa-Gas JSC.

Length

207 km

Capacity

1.45 bcm/y

1.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 530 mm (21 in)

Route

Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline runs from Srednebotuobinskoye Gas and Condensate Field to Lensk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Srednebotuobinskoye Gas and Condensate Field
To
Lensk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
206 km
GEM pipeline ID
P6682
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedSrednebotuobinskoye Gas and Condensate Field → Lensk2071.45530 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline run?
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline runs from Srednebotuobinskoye Gas and Condensate Field to Lensk, crossing Russia.
How long is Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline?
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is 207 km long.
How much gas can Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline carry?
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline has a design capacity of 1.45 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline operating?
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is proposed, with a reported start year of 2028.
Who owns Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline?
Srednebotuobinskoye-Novolenskaya CHP Gas Pipeline is owned by Alrosa-Gas JSC, as recorded in the current tracker release.