Gas transmission pipeline · United States

South Mississippi Project

South Mississippi Project is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 241 km long and 10.22 bcm/y of capacity, starting up in 2028. It is owned by Energy Transfer LP.

Length

241 km

Capacity

10.2 bcm/y

7.5 Mtpa LNG equivalent

Segments tracked

1

Route

No route geometry is available for this pipeline in the current release, so it is not drawn on the map. Start and end points below are shown where GEM reports them.

From
Not reported
To
Not reported
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
Not reported
GEM pipeline ID
P7833
Start year
2028
GEM wiki page
Not reported

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedNot reported24110.2—2028No route

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Cambodia LNG ProjectCambodiaImportCancelled—name match
Filipinas LNG Gateway Project FSRUPhilippinesImportUnder construction—name match
PAWA PNG FSRU ProjectPapua New GuineaImportShelved—name match
Project Venezuela LNG TerminalVenezuelaExportCancelled—name match
Yakutia LNG ProjectRussiaExportProposed—name match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does South Mississippi Project run?
South Mississippi Project is recorded in United States. Global Energy Monitor reports no start and end points for it.
How long is South Mississippi Project?
South Mississippi Project is 241 km long.
How much gas can South Mississippi Project carry?
South Mississippi Project has a design capacity of 10.2 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is South Mississippi Project operating?
South Mississippi Project is proposed, with a reported start year of 2028.
Who owns South Mississippi Project?
South Mississippi Project is owned by Energy Transfer LP, as recorded in the current tracker release.
Does South Mississippi Project serve an LNG terminal?
South Mississippi Project passes within 25 km of 5 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United States

Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.