LNG Chain

Gas transmission pipeline · Jamshoro to Gharo

Sindh University to FJFC Offtake Loopline

Sindh University to FJFC Offtake Loopline is an operating gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 116 km long and 0.61 bcm/y of capacity. It runs from Jamshoro to Gharo. It is owned by Sui Southern Gas Co (SSGC).

Length

116 km

Capacity

0.61 bcm/y

0.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Sindh University to FJFC Offtake Loopline runs from Jamshoro to Gharo. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jamshoro
To
Gharo
Start country
Pakistan
End country
Pakistan
Countries crossed
Pakistan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
102 km
GEM pipeline ID
P4016
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingJamshoro → Gharo1160.61610 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Energas FSRUPakistanImportProposed24.8 kmroute proximity
GasPort FSRU 2PakistanImportProposed24.8 kmroute proximity
Engro FSRU 2PakistanImportCancelled24.9 kmroute proximity
Mashal LNG TerminalPakistanImportCancelled24.9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sindh University to FJFC Offtake Loopline run?
Sindh University to FJFC Offtake Loopline runs from Jamshoro to Gharo, crossing Pakistan.
How long is Sindh University to FJFC Offtake Loopline?
Sindh University to FJFC Offtake Loopline is 116 km long.
How much gas can Sindh University to FJFC Offtake Loopline carry?
Sindh University to FJFC Offtake Loopline has a design capacity of 0.61 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Sindh University to FJFC Offtake Loopline operating?
Sindh University to FJFC Offtake Loopline is operating.
Who owns Sindh University to FJFC Offtake Loopline?
Sindh University to FJFC Offtake Loopline is owned by Sui Southern Gas Co (SSGC), as recorded in the current tracker release.
Does Sindh University to FJFC Offtake Loopline serve an LNG terminal?
Sindh University to FJFC Offtake Loopline passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.