Gas transmission pipeline · Zaoyang to Xuancheng
Sichuan–Shanghai Parallel Gas Pipeline
Sichuan–Shanghai Parallel Gas Pipeline is an under construction gas transmission pipeline in China. The tracker lists 1 tracked segment, 787 km long and 9.53 bcm/y of capacity. It runs from Zaoyang to Xuancheng. It is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd.
Length
787 km
Capacity
9.53 bcm/y
7.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1016 mm (40 in)
Route
Sichuan–Shanghai Parallel Gas Pipeline runs from Zaoyang to Xuancheng. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Zaoyang
- To
- Xuancheng
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 649 km
- GEM pipeline ID
- P4666
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Zaoyang–Xuancheng Connecting Pipeline | Under construction | Zaoyang → Xuancheng | 787 | 9.53 | 1016 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Wuhu LNG Terminal | China | Import | Operating | 16.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Sichuan–Shanghai Parallel Gas Pipeline run?
- Sichuan–Shanghai Parallel Gas Pipeline runs from Zaoyang to Xuancheng, crossing China.
- How long is Sichuan–Shanghai Parallel Gas Pipeline?
- Sichuan–Shanghai Parallel Gas Pipeline is 787 km long.
- How much gas can Sichuan–Shanghai Parallel Gas Pipeline carry?
- Sichuan–Shanghai Parallel Gas Pipeline has a design capacity of 9.53 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Sichuan–Shanghai Parallel Gas Pipeline operating?
- Sichuan–Shanghai Parallel Gas Pipeline is under construction.
- Who owns Sichuan–Shanghai Parallel Gas Pipeline?
- Sichuan–Shanghai Parallel Gas Pipeline is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd, as recorded in the current tracker release.
- Does Sichuan–Shanghai Parallel Gas Pipeline serve an LNG terminal?
- Sichuan–Shanghai Parallel Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.