Gas transmission pipeline · Hubei to Zhejiang
Sichuan–Shanghai Parallel Gas Pipeline
Sichuan–Shanghai Parallel Gas Pipeline is an under construction gas transmission pipeline in China. The tracker lists 1 tracked segment, 1,260 km long and 27 bcm/y of capacity. It runs from Hubei to Zhejiang. It is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd.
Length
1,260 km
Capacity
27 bcm/y
19.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 25806 mm (1016 in)
Route
Sichuan–Shanghai Parallel Gas Pipeline runs from Hubei to Zhejiang. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hubei
- To
- Zhejiang
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 935 km
- GEM pipeline ID
- P4663
- Start year
- Not reported
- Estimated cost (GEM, US dollars)
- $7.78 billion
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Xiantao-Wenzhou Trunk Line | Under construction | Hubei → Zhejiang | 1,260 | 27 | 25806 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Wuhan LNG Terminal | China | Import | Shelved | 19.2 km | route proximity |
| Shanghai Yangshan LNG Terminal | China | Import | Operating | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
In the news
Recent headlines that name Sichuan–Shanghai Parallel Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Sichuan–Shanghai Parallel Gas Pipeline run?
- Sichuan–Shanghai Parallel Gas Pipeline runs from Hubei to Zhejiang, crossing China.
- How long is Sichuan–Shanghai Parallel Gas Pipeline?
- Sichuan–Shanghai Parallel Gas Pipeline is 1,260 km long.
- How much gas can Sichuan–Shanghai Parallel Gas Pipeline carry?
- Sichuan–Shanghai Parallel Gas Pipeline has a design capacity of 27 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Sichuan–Shanghai Parallel Gas Pipeline operating?
- Sichuan–Shanghai Parallel Gas Pipeline is under construction.
- Who owns Sichuan–Shanghai Parallel Gas Pipeline?
- Sichuan–Shanghai Parallel Gas Pipeline is owned by National Petroleum and Natural Gas Pipeline Network Group Co Ltd, as recorded in the current tracker release.
- Does Sichuan–Shanghai Parallel Gas Pipeline serve an LNG terminal?
- Sichuan–Shanghai Parallel Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in China
Listed in name order among the 968 pipelines tracked in China, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Sichuan–Shanghai Parallel Gas PipelineZhejiang to Fujian · 150 km
- Sichuan–Shanghai Parallel Gas PipelineHubei to Anhui · 787 km
- Sichuan–Shanghai Parallel Gas PipelineHubei to Hubei · 63 km
- Sichuan–Shanghai Gas PipelineJiangsu to Jiangsu · 13 km
- Sichuan–Shanghai Parallel Gas PipelineAnhui to Anhui · 68 km
- Sichuan–Shanghai Parallel Gas PipelineAnhui to Jiangxi · 170 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.