Gas transmission pipeline · Russia
Serpukhov-Kalinin-Leningrad Pipeline
Serpukhov-Kalinin-Leningrad Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 803 km long and 3.7 bcm/y of capacity, starting up in 1959. It is owned by Gazprom PJSC.
Length
803 km
Capacity
3.7 bcm/y
2.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 18288 mm (720 in)
Route
Serpukhov-Kalinin-Leningrad Pipeline runs from Russia. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 783 km
- GEM pipeline ID
- P1456
- Start year
- 1959
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Not reported | 803 | 3.7 | 18288 mm | 1959 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%
In the news
Recent headlines that name Serpukhov-Kalinin-Leningrad Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Serpukhov-Kalinin-Leningrad Pipeline run?
- Serpukhov-Kalinin-Leningrad Pipeline is recorded in Russia. Global Energy Monitor reports no start and end points for it.
- How long is Serpukhov-Kalinin-Leningrad Pipeline?
- Serpukhov-Kalinin-Leningrad Pipeline is 803 km long.
- How much gas can Serpukhov-Kalinin-Leningrad Pipeline carry?
- Serpukhov-Kalinin-Leningrad Pipeline has a design capacity of 3.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Serpukhov-Kalinin-Leningrad Pipeline operating?
- Serpukhov-Kalinin-Leningrad Pipeline is operating, having started in 1959.
- Who owns Serpukhov-Kalinin-Leningrad Pipeline?
- Serpukhov-Kalinin-Leningrad Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
More gas pipelines in Russia
Listed in name order among the 266 pipelines tracked in Russia, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Shebelinka-Belgorod-Kursk-Bryansk Gas PipelineKharkiv Oblast to Bryansk Oblast · 507 km
- Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas PipelineVologda Oblast to Vologda Oblast · 118 km
- Sheksna-Kirillov-Lipin Bor-Vytegra-Pudozh Gas PipelineVologda Oblast to Vologda Oblast · 55 km
- Saratov-Gorky Gas PipelineSaratov Oblast to Nizhny Novgorod Oblast · 606 km
- Saratov-Moscow Gas PipelineSaratov Oblast to Moscow Oblast · 840 km
- Selivanovo Gas PipelineSmolensk Oblast to Smolensk Oblast · 36 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.