LNG Atlas

Gas transmission pipeline · Sharjah to Sharjah

Sajaa–Hamriya Gas Pipeline

Sajaa–Hamriya Gas Pipeline is an operating gas transmission pipeline in United Arab Emirates. The tracker lists 1 tracked segment, 32 km long and 10.33 bcm/y of capacity, starting up in 2008. It runs from Sharjah to Sharjah. It is owned by Dana Gas and Emirates General Petroleum Corp.

Length

32 km

Capacity

10.3 bcm/y

7.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1219 mm (48 in)

Route

Sajaa–Hamriya Gas Pipeline runs from Sharjah to Sharjah. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Sharjah
To
Sharjah
Start country
United Arab Emirates
End country
United Arab Emirates
Countries crossed
United Arab Emirates
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
21 km
GEM pipeline ID
P0520
Start year
2008
Estimated cost (GEM, US dollars)
$182 million
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
2OperatingSharjah → Sharjah3210.31219 mm2008GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Sharjah FSRUUnited Arab EmiratesImportCancelled14.1 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sajaa–Hamriya Gas Pipeline run?
Sajaa–Hamriya Gas Pipeline runs from Sharjah to Sharjah, crossing United Arab Emirates.
How long is Sajaa–Hamriya Gas Pipeline?
Sajaa–Hamriya Gas Pipeline is 32 km long.
How much gas can Sajaa–Hamriya Gas Pipeline carry?
Sajaa–Hamriya Gas Pipeline has a design capacity of 10.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Sajaa–Hamriya Gas Pipeline operating?
Sajaa–Hamriya Gas Pipeline is operating, having started in 2008.
Who owns Sajaa–Hamriya Gas Pipeline?
Sajaa–Hamriya Gas Pipeline is owned by Dana Gas and Emirates General Petroleum Corp, as recorded in the current tracker release.
Does Sajaa–Hamriya Gas Pipeline serve an LNG terminal?
Sajaa–Hamriya Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United Arab Emirates

Listed in name order among the 38 pipelines tracked in United Arab Emirates, so projects with the same name sit together. A browse aid, not a claim that they are alike.

Cite this page

Reuse is welcome; please name the page and the tracker release it draws on.

BibTeX
Share this page:XLinkedInFacebookBlueskyRedditEmail