Gas transmission pipeline · Sharjah to Hamriya
Sajaa–Hamriya Gas Pipeline
Sajaa–Hamriya Gas Pipeline is an operating gas transmission pipeline in United Arab Emirates. The tracker lists 1 tracked segment, 36 km long. It runs from Sharjah to Hamriya. It is owned by Dana Gas and Emirates General Petroleum Corp.
Length
36 km
Capacity
Not reported
Segments tracked
1
Largest diameter 254 mm (10 in)
Route
Sajaa–Hamriya Gas Pipeline runs from Sharjah to Hamriya. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sharjah
- To
- Hamriya
- Start country
- United Arab Emirates
- End country
- United Arab Emirates
- Countries crossed
- United Arab Emirates
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 36 km
- GEM pipeline ID
- P5778
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| 1 | Operating | Sharjah → Hamriya | 36 | Not reported | 254 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sharjah FSRU | United Arab Emirates | Import | Cancelled | 11 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Dana Gas50%
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Sajaa–Hamriya Gas Pipeline run?
- Sajaa–Hamriya Gas Pipeline runs from Sharjah to Hamriya, crossing United Arab Emirates.
- How long is Sajaa–Hamriya Gas Pipeline?
- Sajaa–Hamriya Gas Pipeline is 36 km long.
- How much gas can Sajaa–Hamriya Gas Pipeline carry?
- No design capacity is reported for Sajaa–Hamriya Gas Pipeline. That is an absent figure, not a zero.
- Is Sajaa–Hamriya Gas Pipeline operating?
- Sajaa–Hamriya Gas Pipeline is operating.
- Who owns Sajaa–Hamriya Gas Pipeline?
- Sajaa–Hamriya Gas Pipeline is owned by Dana Gas and Emirates General Petroleum Corp, as recorded in the current tracker release.
- Does Sajaa–Hamriya Gas Pipeline serve an LNG terminal?
- Sajaa–Hamriya Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.