Gas transmission pipeline · Alabama to Florida
Sabal Trail Gas Transmission Pipeline
Sabal Trail Gas Transmission Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 830 km long and 8.48 bcm/y of capacity, starting up in 2017. It runs from Alabama to Florida. It is owned by Sabal Trail Transmission LLC.
Length
830 km
Capacity
8.48 bcm/y
6.2 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Sabal Trail Gas Transmission Pipeline runs from Alabama to Florida. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Alabama
- To
- Florida
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 796 km
- GEM pipeline ID
- P0249
- Start year
- 2017
- Estimated cost (GEM, US dollars)
- $3.2 billion
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Project Phase I | Operating | Alabama → Florida | 830 | 8.48 | 610 mm | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Strom LNG Terminal | United States | Export | Cancelled | 7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name Sabal Trail Gas Transmission Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Sabal Trail Gas Transmission Pipeline run?
- Sabal Trail Gas Transmission Pipeline runs from Alabama to Florida, crossing United States.
- How long is Sabal Trail Gas Transmission Pipeline?
- Sabal Trail Gas Transmission Pipeline is 830 km long.
- How much gas can Sabal Trail Gas Transmission Pipeline carry?
- Sabal Trail Gas Transmission Pipeline has a design capacity of 8.48 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Sabal Trail Gas Transmission Pipeline operating?
- Sabal Trail Gas Transmission Pipeline is operating, having started in 2017.
- Who owns Sabal Trail Gas Transmission Pipeline?
- Sabal Trail Gas Transmission Pipeline is owned by Sabal Trail Transmission LLC, as recorded in the current tracker release.
- Does Sabal Trail Gas Transmission Pipeline serve an LNG terminal?
- Sabal Trail Gas Transmission Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in United States
Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- Sabal Trail Gas Transmission PipelineAlabama to Florida · 0 km
- Sabal Trail Gas Transmission PipelineAlabama to Florida · 0 km
- Sabine Crossing Gas PipelineTexas to Louisiana · 89 km
- Rover PipelineWest Virginia to West Virginia · 0 km
- Rover PipelinePennsylvania to Pennsylvania · 0 km
- Ruby Gas PipelineWyoming to Oregon · 1,099 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.