LNG Atlas

Gas transmission pipeline · Alabama to Florida

Sabal Trail Gas Transmission Pipeline

Sabal Trail Gas Transmission Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 0 km long and 1.74 bcm/y of capacity, starting up in 2020. It runs from Alabama to Florida. It is owned by Sabal Trail Transmission LLC.

Length

0 km

Capacity

1.74 bcm/y

1.3 Mtpa LNG equivalent

Segments tracked

1

Route

Sabal Trail Gas Transmission Pipeline runs from Alabama to Florida. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Alabama
To
Florida
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
796 km
GEM pipeline ID
P2606
Start year
2020
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Project Phase IIOperatingAlabama → Florida01.74—2020GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Strom LNG TerminalUnited StatesExportCancelled7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sabal Trail Gas Transmission Pipeline run?
Sabal Trail Gas Transmission Pipeline runs from Alabama to Florida, crossing United States.
How long is Sabal Trail Gas Transmission Pipeline?
No length is reported for Sabal Trail Gas Transmission Pipeline and no route geometry is available to measure one from.
How much gas can Sabal Trail Gas Transmission Pipeline carry?
Sabal Trail Gas Transmission Pipeline has a design capacity of 1.74 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Sabal Trail Gas Transmission Pipeline operating?
Sabal Trail Gas Transmission Pipeline is operating, having started in 2020.
Who owns Sabal Trail Gas Transmission Pipeline?
Sabal Trail Gas Transmission Pipeline is owned by Sabal Trail Transmission LLC, as recorded in the current tracker release.
Does Sabal Trail Gas Transmission Pipeline serve an LNG terminal?
Sabal Trail Gas Transmission Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in United States

Listed in name order among the 515 pipelines tracked in United States, so projects with the same name sit together. A browse aid, not a claim that they are alike.