Sabah-Sarawak Gas Pipeline (SSGP)

Sabah-Sarawak Gas Pipeline (SSGP) is an operating gas transmission pipeline in Malaysia. The tracker lists 1 tracked segment, 512 km long and 7.7 bcm/y of capacity, starting up in 2014. It runs from Sabah to Sarawak. It is owned by Petronas International Co Ltd.

Length

512 km

Capacity

7.7 bcm/y

5.7 Mtpa LNG equivalent

Segments tracked

1

Route

Sabah-Sarawak Gas Pipeline (SSGP) runs from Sabah to Sarawak. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Sabah
To
Sarawak
Start country
Malaysia
End country
Malaysia
Countries crossed
Malaysia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
504 km
GEM pipeline ID
P1066
Start year
2014
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingSabah → Sarawak5127.7—2014GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Malaysia LNG Terminal Train 9MalaysiaExportOperating0.8 kmroute proximity
Tiga Malaysia LNG TerminalMalaysiaExportOperating0.8 kmroute proximity
Dua Malaysia LNG TerminalMalaysiaExportOperating1.6 kmroute proximity
Satu Malaysia TerminalMalaysiaExportOperating1.7 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Sabah-Sarawak Gas Pipeline (SSGP) run?
Sabah-Sarawak Gas Pipeline (SSGP) runs from Sabah to Sarawak, crossing Malaysia.
How long is Sabah-Sarawak Gas Pipeline (SSGP)?
Sabah-Sarawak Gas Pipeline (SSGP) is 512 km long.
How much gas can Sabah-Sarawak Gas Pipeline (SSGP) carry?
Sabah-Sarawak Gas Pipeline (SSGP) has a design capacity of 7.7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Sabah-Sarawak Gas Pipeline (SSGP) operating?
Sabah-Sarawak Gas Pipeline (SSGP) is operating, having started in 2014.
Who owns Sabah-Sarawak Gas Pipeline (SSGP)?
Sabah-Sarawak Gas Pipeline (SSGP) is owned by Petronas International Co Ltd, as recorded in the current tracker release.
Does Sabah-Sarawak Gas Pipeline (SSGP) serve an LNG terminal?
Sabah-Sarawak Gas Pipeline (SSGP) passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Malaysia

Listed in name order among the 5 pipelines tracked in Malaysia, so projects with the same name sit together. A browse aid, not a claim that they are alike.