LNG Chain

Gas transmission pipeline · Florovouni to Otranto

Poseidon Gas Pipeline

Poseidon Gas Pipeline is a proposed gas transmission pipeline crossing Greece, Italy. The tracker lists 1 tracked segment, 210 km long and 12 bcm/y of capacity, starting up in 2027. It runs from Florovouni to Otranto. It is owned by IGI Poseidon SA.

Length

210 km

Capacity

12 bcm/y

8.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 916 mm (36 in)

Route

Poseidon Gas Pipeline runs from Florovouni to Otranto. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Florovouni
To
Otranto
Start country
Greece
End country
Italy
Countries crossed
Greece, Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
726 km
GEM pipeline ID
P1345
Start year
2027
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Offshore SectionProposedFlorovouni → Otranto21012916 mm2027GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Thessaloniki FSRUGreeceImportProposed17.3 kmroute proximity
Poseidon FLNG TerminalAustraliaExportCancelledname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Poseidon Gas Pipeline run?
Poseidon Gas Pipeline runs from Florovouni to Otranto, crossing Greece and Italy.
How long is Poseidon Gas Pipeline?
Poseidon Gas Pipeline is 210 km long.
How much gas can Poseidon Gas Pipeline carry?
Poseidon Gas Pipeline has a design capacity of 12 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Poseidon Gas Pipeline operating?
Poseidon Gas Pipeline is proposed, with a reported start year of 2027.
Who owns Poseidon Gas Pipeline?
Poseidon Gas Pipeline is owned by IGI Poseidon SA, as recorded in the current tracker release.
Does Poseidon Gas Pipeline serve an LNG terminal?
Poseidon Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.