Gas transmission pipeline · Greece
Megalopoli-Patras Gas Pipeline
Megalopoli-Patras Gas Pipeline is a proposed gas transmission pipeline in Greece. The tracker lists 1 tracked segment, 145 km long, starting up in 2027. It is owned by DESFA.
Length
145 km
Capacity
Not reported
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Megalopoli-Patras Gas Pipeline runs from Greece. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Not reported
- To
- Not reported
- Start country
- Greece
- End country
- Greece
- Countries crossed
- Greece
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 127 km
- GEM pipeline ID
- P4362
- Start year
- 2027
- Estimated cost (GEM, US dollars)
- $111 million
- Final investment decision
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Not reported | 145 | Not reported | 508 mm | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- DESFA100%
Parent companies
- Snam SpA36.2%
- Government of Greece34%
- Enagas Internacional SLU12.1%
- Fluxys Europe SA12.1%
- DAMCO Energy SA6.7%
In the news
Recent headlines that name Megalopoli-Patras Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Megalopoli-Patras Gas Pipeline run?
- Megalopoli-Patras Gas Pipeline is recorded in Greece. Global Energy Monitor reports no start and end points for it.
- How long is Megalopoli-Patras Gas Pipeline?
- Megalopoli-Patras Gas Pipeline is 145 km long.
- How much gas can Megalopoli-Patras Gas Pipeline carry?
- No design capacity is reported for Megalopoli-Patras Gas Pipeline. That is an absent figure, not a zero.
- Is Megalopoli-Patras Gas Pipeline operating?
- Megalopoli-Patras Gas Pipeline is proposed, with a reported start year of 2027.
- Who owns Megalopoli-Patras Gas Pipeline?
- Megalopoli-Patras Gas Pipeline is owned by DESFA, as recorded in the current tracker release.
More gas pipelines in Greece
Listed in name order among the 19 pipelines tracked in Greece, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.