Gas transmission pipeline · Wantage, Sussex County to Pleasant Valley
NYMarc Gas Pipeline Project
NYMarc Gas Pipeline Project is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 106 km long. It runs from Wantage, Sussex County to Pleasant Valley. It is owned by TC Energy Corp and Dominion Energy Inc.
Length
106 km
Capacity
Not reported
Segments tracked
1
Route
NYMarc Gas Pipeline Project runs from Wantage, Sussex County to Pleasant Valley. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Wantage, Sussex County
- To
- Pleasant Valley
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 85 km
- GEM pipeline ID
- P0233
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Wantage, Sussex County → Pleasant Valley | 106 | Not reported | — | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cambodia LNG Project | Cambodia | Import | Cancelled | — | name match |
| Filipinas LNG Gateway Project FSRU | Philippines | Import | Shelved | — | name match |
| Project Venezuela LNG Terminal | Venezuela | Export | Cancelled | — | name match |
| Yakutia LNG Project | Russia | Export | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does NYMarc Gas Pipeline Project run?
- NYMarc Gas Pipeline Project runs from Wantage, Sussex County to Pleasant Valley, crossing United States.
- How long is NYMarc Gas Pipeline Project?
- NYMarc Gas Pipeline Project is 106 km long.
- How much gas can NYMarc Gas Pipeline Project carry?
- No design capacity is reported for NYMarc Gas Pipeline Project. That is an absent figure, not a zero.
- Is NYMarc Gas Pipeline Project operating?
- NYMarc Gas Pipeline Project is cancelled.
- Who owns NYMarc Gas Pipeline Project?
- NYMarc Gas Pipeline Project is owned by Dominion Energy Inc and TC Energy Corp, as recorded in the current tracker release.
- Does NYMarc Gas Pipeline Project serve an LNG terminal?
- NYMarc Gas Pipeline Project passes within 25 km of 4 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.