Gas transmission pipeline · Basrah to Basrah
North Rumela-Khor Al-Zubair Gas Pipeline
North Rumela-Khor Al-Zubair Gas Pipeline is an operating gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 87 km long and 10 bcm/y of capacity. It runs from Basrah to Basrah. It is owned by Iraq Ministry of Oil.
Length
87 km
Capacity
10 bcm/y
7.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
North Rumela-Khor Al-Zubair Gas Pipeline runs from Basrah to Basrah. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Basrah
- To
- Basrah
- Start country
- Iraq
- End country
- Iraq
- Countries crossed
- Iraq
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 33 km
- GEM pipeline ID
- P2234
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Basrah → Basrah | 87 | 10 | 1067 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Khor Al-Zubair FSRU | Iraq | Import | Proposed | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
In the news
Recent headlines that name North Rumela-Khor Al-Zubair Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does North Rumela-Khor Al-Zubair Gas Pipeline run?
- North Rumela-Khor Al-Zubair Gas Pipeline runs from Basrah to Basrah, crossing Iraq.
- How long is North Rumela-Khor Al-Zubair Gas Pipeline?
- North Rumela-Khor Al-Zubair Gas Pipeline is 87 km long.
- How much gas can North Rumela-Khor Al-Zubair Gas Pipeline carry?
- North Rumela-Khor Al-Zubair Gas Pipeline has a design capacity of 10 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is North Rumela-Khor Al-Zubair Gas Pipeline operating?
- North Rumela-Khor Al-Zubair Gas Pipeline is operating.
- Who owns North Rumela-Khor Al-Zubair Gas Pipeline?
- North Rumela-Khor Al-Zubair Gas Pipeline is owned by Iraq Ministry of Oil, as recorded in the current tracker release.
- Does North Rumela-Khor Al-Zubair Gas Pipeline serve an LNG terminal?
- North Rumela-Khor Al-Zubair Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.
More gas pipelines in Iraq
Listed in name order among the 52 pipelines tracked in Iraq, so projects with the same name sit together. A browse aid, not a claim that they are alike.
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.