Gas transmission pipeline · Cairo to Giza
New Administrative Capital–Dahshur Gas Pipeline
New Administrative Capital–Dahshur Gas Pipeline is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 70 km long, starting up in 2017. It runs from Cairo to Giza. It is owned by Egyptian Natural Gas Holding Co.
Length
70 km
Capacity
Not reported
Segments tracked
1
Largest diameter 813 mm (32 in)
Route
New Administrative Capital–Dahshur Gas Pipeline runs from Cairo to Giza. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Cairo
- To
- Giza
- Start country
- Egypt
- End country
- Egypt
- Countries crossed
- Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 54 km
- GEM pipeline ID
- P3930
- Start year
- 2017
- Estimated cost (GEM, US dollars)
- $38.7 million
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Cairo → Giza | 70 | Not reported | 813 mm | 2017 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
In the news
Recent headlines that name New Administrative Capital–Dahshur Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does New Administrative Capital–Dahshur Gas Pipeline run?
- New Administrative Capital–Dahshur Gas Pipeline runs from Cairo to Giza, crossing Egypt.
- How long is New Administrative Capital–Dahshur Gas Pipeline?
- New Administrative Capital–Dahshur Gas Pipeline is 70 km long.
- How much gas can New Administrative Capital–Dahshur Gas Pipeline carry?
- No design capacity is reported for New Administrative Capital–Dahshur Gas Pipeline. That is an absent figure, not a zero.
- Is New Administrative Capital–Dahshur Gas Pipeline operating?
- New Administrative Capital–Dahshur Gas Pipeline is operating, having started in 2017.
- Who owns New Administrative Capital–Dahshur Gas Pipeline?
- New Administrative Capital–Dahshur Gas Pipeline is owned by Egyptian Natural Gas Holding Co, as recorded in the current tracker release.
More gas pipelines in Egypt
Listed in name order among the 52 pipelines tracked in Egypt, so projects with the same name sit together. A browse aid, not a claim that they are alike.
- New Fayoum Gas PipelineFayoum to Fayoum · 40 km
- Nooros–Abu Madi–El Gamil Gas PiplineDakahlia to Port Said · 130 km
- Nubaria–Sadat Gas PipelineAlexandria to Monufia · 73 km
- Idku-Abu Hummus Gas PipelineBeheira to Beheira · 30 km
- Mahmoudiah PS Gas Pipeline52 km
- New Administration Capital PS Gas Pipeline63 km
Cite this page
Reuse is welcome; please name the page and the tracker release it draws on.