Gas transmission pipeline · Ain Sokhna to Cairo
New Administration Capital PS Gas Pipeline
New Administration Capital PS Gas Pipeline is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 65 km long. It runs from Ain Sokhna to Cairo. It is owned by General Petroleum Co.
Length
65 km
Capacity
Not reported
Segments tracked
1
Largest diameter 813 mm (32 in)
Route
New Administration Capital PS Gas Pipeline runs from Ain Sokhna to Cairo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ain Sokhna
- To
- Cairo
- Start country
- Egypt
- End country
- Egypt
- Countries crossed
- Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 55 km
- GEM pipeline ID
- P7574
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Ain Sokhna-New Admenistration Captial P.S Gas Pipeline | Operating | Ain Sokhna → Cairo | 65 | Not reported | 813 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Ain Sokhna FSRU | Egypt | Import | Operating | 10.9 km | route proximity |
| Sumed FSRU | Egypt | Import | Operating | 11.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does New Administration Capital PS Gas Pipeline run?
- New Administration Capital PS Gas Pipeline runs from Ain Sokhna to Cairo, crossing Egypt.
- How long is New Administration Capital PS Gas Pipeline?
- New Administration Capital PS Gas Pipeline is 65 km long.
- How much gas can New Administration Capital PS Gas Pipeline carry?
- No design capacity is reported for New Administration Capital PS Gas Pipeline. That is an absent figure, not a zero.
- Is New Administration Capital PS Gas Pipeline operating?
- New Administration Capital PS Gas Pipeline is operating.
- Who owns New Administration Capital PS Gas Pipeline?
- New Administration Capital PS Gas Pipeline is owned by General Petroleum Co, as recorded in the current tracker release.
- Does New Administration Capital PS Gas Pipeline serve an LNG terminal?
- New Administration Capital PS Gas Pipeline passes within 25 km of 2 tracked LNG terminals. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.