Gas transmission pipeline · Libya
NC 41-Mellitah Gas Pipeline
NC 41-Mellitah Gas Pipeline is an under construction gas transmission pipeline in Libya. The tracker lists 1 tracked segment, 130 km long, starting up in 2025. It is owned by Libyan National Oil Corp and Eni.
Length
130 km
Capacity
Not reported
Segments tracked
1
Largest diameter 762 mm (30 in)
Route
NC 41-Mellitah Gas Pipeline runs from Libya. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bay of Tripoli
- To
- Not reported
- Start country
- Libya
- End country
- Libya
- Countries crossed
- Libya
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Not reported
- Route drawn on map
- 795 km
- GEM pipeline ID
- P6708
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Bay of Tripoli → ? | 130 | Not reported | 762 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
- Eni50%
- National Oil Corp50%
In the news
Recent headlines that name NC 41-Mellitah Gas Pipeline. Matched by name, so it is approximate. Titles and links only; we store no article text.
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does NC 41-Mellitah Gas Pipeline run?
- NC 41-Mellitah Gas Pipeline is recorded in Libya. Global Energy Monitor reports no start and end points for it.
- How long is NC 41-Mellitah Gas Pipeline?
- NC 41-Mellitah Gas Pipeline is 130 km long.
- How much gas can NC 41-Mellitah Gas Pipeline carry?
- No design capacity is reported for NC 41-Mellitah Gas Pipeline. That is an absent figure, not a zero.
- Is NC 41-Mellitah Gas Pipeline operating?
- NC 41-Mellitah Gas Pipeline is under construction, with a reported start year of 2025.
- Who owns NC 41-Mellitah Gas Pipeline?
- NC 41-Mellitah Gas Pipeline is owned by Eni and Libyan National Oil Corp, as recorded in the current tracker release.
More gas pipelines in Libya
Listed in name order among the 37 pipelines tracked in Libya, so projects with the same name sit together. A browse aid, not a claim that they are alike.