Gas transmission pipeline · Vilnius to Riga
Lithuania-Latvia Interconnection Gas Pipeline
Lithuania-Latvia Interconnection Gas Pipeline is an operating gas transmission pipeline crossing Lithuania, Latvia. The tracker lists 1 tracked segment, 138 km long and 2.3 bcm/y of capacity, starting up in 1962. It runs from Vilnius to Riga. It is owned by Latvijas Gaze and Energijos Skirstymo Operatorius.
Length
138 km
Capacity
2.3 bcm/y
1.7 Mtpa LNG equivalent
Segments tracked
1
Route
Lithuania-Latvia Interconnection Gas Pipeline runs from Vilnius to Riga. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Vilnius
- To
- Riga
- Start country
- Lithuania
- End country
- Latvia
- Countries crossed
- Lithuania, Latvia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 101 km
- GEM pipeline ID
- P0705
- Start year
- 1962
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Vilnius → Riga | 138 | 2.3 | — | 1962 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Riga FSRU | Latvia | Import | Cancelled | 5.1 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Lithuania-Latvia Interconnection Gas Pipeline run?
- Lithuania-Latvia Interconnection Gas Pipeline runs from Vilnius to Riga, crossing Lithuania and Latvia.
- How long is Lithuania-Latvia Interconnection Gas Pipeline?
- Lithuania-Latvia Interconnection Gas Pipeline is 138 km long.
- How much gas can Lithuania-Latvia Interconnection Gas Pipeline carry?
- Lithuania-Latvia Interconnection Gas Pipeline has a design capacity of 2.3 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Lithuania-Latvia Interconnection Gas Pipeline operating?
- Lithuania-Latvia Interconnection Gas Pipeline is operating, having started in 1962.
- Who owns Lithuania-Latvia Interconnection Gas Pipeline?
- Lithuania-Latvia Interconnection Gas Pipeline is owned by Energijos Skirstymo Operatorius and Latvijas Gaze, as recorded in the current tracker release.
- Does Lithuania-Latvia Interconnection Gas Pipeline serve an LNG terminal?
- Lithuania-Latvia Interconnection Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.