LNG Atlas

Gas transmission pipeline · Lithuania – Latvia

Lithuania-Latvia Interconnection Gas Pipeline

Lithuania-Latvia Interconnection Gas Pipeline is an under construction gas transmission pipeline crossing Lithuania, Latvia. The tracker lists 1 tracked segment, 0 km long and 0.58 bcm/y of capacity, starting up in 2024. It is owned by JSC Conexus Baltic Grid.

Length

0 km

Capacity

0.58 bcm/y

0.4 Mtpa LNG equivalent

Segments tracked

1

Route

Lithuania-Latvia Interconnection Gas Pipeline runs from Lithuania – Latvia. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Not reported
To
Not reported
Start country
Lithuania
End country
Latvia
Countries crossed
Lithuania, Latvia
Onshore / offshore
Not reported
Fuel
Gas
Region
Not reported
Route drawn on map
101 km
GEM pipeline ID
P2025
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
ExpansionUnder constructionNot reported00.58—2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Riga FSRULatviaImportShelved5.1 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Lithuania-Latvia Interconnection Gas Pipeline run?
Lithuania-Latvia Interconnection Gas Pipeline runs from Lithuania to Latvia, crossing Lithuania and Latvia.
How long is Lithuania-Latvia Interconnection Gas Pipeline?
No length is reported for Lithuania-Latvia Interconnection Gas Pipeline and no route geometry is available to measure one from.
How much gas can Lithuania-Latvia Interconnection Gas Pipeline carry?
Lithuania-Latvia Interconnection Gas Pipeline has a design capacity of 0.58 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Lithuania-Latvia Interconnection Gas Pipeline operating?
Lithuania-Latvia Interconnection Gas Pipeline is under construction, with a reported start year of 2024.
Who owns Lithuania-Latvia Interconnection Gas Pipeline?
Lithuania-Latvia Interconnection Gas Pipeline is owned by JSC Conexus Baltic Grid, as recorded in the current tracker release.
Does Lithuania-Latvia Interconnection Gas Pipeline serve an LNG terminal?
Lithuania-Latvia Interconnection Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.

More gas pipelines in Lithuania

Listed in name order among the 7 pipelines tracked in Lithuania, so projects with the same name sit together. A browse aid, not a claim that they are alike.